MN DOT 511 Traveler Information
Weather Stations—Statewide
Map of Statewide Between Exit 112B: Portland Avenue and Exit 114A: 28th Avenue (near Richfield). The roadway is reduced to one lane. The right turn bay is closed because of night time construction work. From 8:00PM CDT to 5:00AM CDT on Sunday and Monday. Between Jade Road (Silver Lake) and MN 25 (Mayer). The roadway is reduced to one lane. Road construction work is in progress. A pilot car is in operation. Look out for flaggers. Traffic is being held. Expect delays. Until October 12, 2018 at about 5:00PM CDT. Between Exit 97: MN 114 and Exit 100: MN 27 (near Alexandria). Expect single line traffic alternating directions. Bridge construction work is in progress. Reduce your speed. There is a width limit in effect. Width limit 12'0". Until October 12, 2018 at about 8:00PM CDT. Between 700th Avenue and MN 4 (near Saint James). The exit ramp is closed. The entrance ramp is closed due to road work. There is a width limit in effect. A detour is in operation. Width limit 10'0". Until November 2, 2018 at about 4:00PM CDT. Between County Road 11 (near Dumont) and MN 27; 2nd Avenue South (Wheaton). The road is closed. The road is being repaved. A detour is in operation. Until October 12, 2018 at about 4:30PM CDT. Between I-494 (Mendota Heights) and West George Street (Saint Paul). Be aware of narrow lanes. Look out for construction work. There is a width limit in effect. Width limit 10'0". From 12:00AM CDT to 12:00PM CDT daily. Until October 31, 2018 at about 12:00PM CDT. Between Sather Drive and County Highway 4 (near Lengby). Major road construction work is in progress. There are alternating lane closures. There is a width limit in effect. A pilot car is in operation. Look out for flaggers. Width limit 12'0". Until October 13, 2018 at about 7:00PM CDT. Between MN 610 (near Maple Grove) and Brockton Lane (near Dayton). Two left lanes are blocked. Road maintenance work is in progress. Night time construction work is in progress. Until today at about 5:00AM CDT. Between County Road 26 and Old 169 (near Garrison). The roadway is reduced to two lanes. Bridge maintenance work is in progress. There is a width limit in effect. Width limit 11'0". Until October 20, 2018 at about 7:00PM CDT. Between MN 4 and 760th Avenue (near Saint James). The exit ramp is closed. The entrance ramp is closed due to road construction work. There is a width limit in effect. A detour is in operation. Width limit 10'0". Until November 2, 2018 at about 3:00PM CDT. Between Exit 24: Ramsey County Road C (Saint Anthony) and Exit 18: University Avenue (near Lauderdale). Night time construction work is in progress. There are alternating lane closures. The exit ramp is closed. The entrance ramp is closed. Expect delays. Until October 1, 2018 at about 5:00AM CDT. Between Mesaba Avenue and West 1st Street (Duluth). The right lane is closed. There is a width limit in effect. Speed restrictions are in force. Expect changing traffic patterns. Consider using an alternate route. Width limit 11'0". Speed limit 25 MPH. Until October 15, 2018 at about 2:00PM CDT. Between Exit 159: Rush Lake Road (Rush City) and Exit 169: Hillside Avenue (Pine City). The roadway is reduced to one lane. There is a width limit in effect. Bridge construction work is in progress. Observe the signs. Width limit 12'0". Until October 30, 2018 at about 2:00PM CDT. Between East Hayden Lake Road (Champlin) and Rice Street (Anoka). Look out for construction work. There are alternating lane closures. Short delays are possible. From 6:00AM CDT to 7:00PM CDT daily. Until October 6, 2018 at about 7:00PM CDT. Between Exit 16A: I-94 (Minneapolis) and Exit 11A: Lyndale Avenue (Richfield). The road is closed. Night time construction work is in progress. Follow the detour signs. Until today at about 5:00AM CDT. Between 125th Street (near Blue Earth) and Timberwolf Lane (Winnebago). The roadway is reduced to one lane due to road construction work. There is a width limit in effect. Look out for flaggers. A pilot car is in operation. There is work on the shoulder. Width limit 10'0". Until October 16, 2018 at about 3:00PM CDT. Between Exit 193: MN 25 and Exit 194: CR 18 (Monticello). The roadway is reduced to two lanes. Bridge construction work is in progress. Until November 1, 2018 at about 10:30AM CDT. Between East Hayden Lake Road (Champlin) and Rice Street (Anoka). Night time construction work is in progress. There are alternating lane closures. Short delays are possible. Until Saturday, at about 5:00AM CDT. Between 54th Street Southeast and US 63 (4 miles south of the Rochester area). The roadway is reduced to one lane due to road construction work. Expect delays. There is a width limit in effect. Width limit 12'0". Until Friday, at about 5:00PM CDT. Between Cliff Road and 127th Street West, Palomino Drive (near Apple Valley). Road construction work is in progress. Night time construction work is in progress. The right lane is closed. The exit ramp is closed. Until today at about 5:00AM CDT. Between I-94 and Elm Creek Boulevard (Maple Grove). The left lane is closed. Road construction work is in progress. Expect delays. Until October 27, 2018 at about 6:00PM CDT. Between 690th Avenue (near Saint James) and MN 15 (near Lewisville). The roadway is reduced to one lane due to road construction work. There is a width limit in effect. Speed restrictions are in force. Width limit 10'0". Speed limit 55 MPH. Until November 2, 2018 at about 2:00PM CDT. Between 80th Street and 110th Street (near Pease). The roadway is reduced to one lane. The right lane is closed. Road maintenance work is in progress. Until Friday, at about 10:30AM CDT. Between Exit 82: MN 79 (near Evansville) and Exit 97: MN 114 (2 miles west of the Alexandria area). Expect delays. A lane is closed intermittently. Until November 17, 2019 at about 5:00PM CDT. Between Exit 24: Ramsey County Road C (Saint Anthony) and Exit 18: University Avenue (near Lauderdale). Night time construction work is in progress. The entrance ramp is closed. The exit ramp is closed. There are alternating lane closures. Expect delays. Until October 1, 2018 at about 5:00AM CDT. Between 245th Street and 260th Street (13 to 15 miles west of the Clarkfield area). The bridge is closed. Bridge construction work is in progress. A detour is in operation. Until October 26, 2018 at about 9:00PM CDT. Between County Road 130 and County Road 93 (Ranier). A lane is closed. There is a width limit in effect. Speed restrictions are in force. Bridge construction work is in progress. Look out for flaggers. Width limit 11'0". Speed limit 35 MPH. Until October 8, 2018 at about 2:00PM CDT. Between 4th Street and Loop Road (near Two Harbors). The roadway is reduced to one lane. There is a width limit in effect. Road construction work is in progress. Look out for flaggers. Width limit 11'0". Until October 16, 2018 at about 2:00PM CDT. Between Exit 64A: Hardman Avenue and Exit 65: 7th Avenue (South Saint Paul). Look out for construction work. There are alternating lane closures. The exit ramp is closed. The entrance ramp is closed. There is a width limit in effect. Width limit 11'0". Until November 15, 2018 at about 6:00PM CDT. Between Grace Drive (4 miles south of the Detroit Lakes area) and Willow Street West (Detroit Lakes). The road is being repaved. There are alternating lane closures. Look out for flaggers. A pilot car is in operation. Short delays are possible. Until Friday, at about 9:00PM CDT. Between Exit 36 (Lino Lakes) and Exit 30: US 10 (Mounds View). The left lane is closed. The roadway is reduced to one lane. Night time construction work is in progress. From 7:00PM CDT to 5:00AM CDT on weekdays. Until Friday, at about 5:00AM CDT. Between Exit 28B: US 10 (Mounds View) and Exit 36 (Circle Pines). The left lane is closed. Night time construction work is in progress. From 7:00PM CDT to 12:00PM CDT on weekdays and Saturday. Until Saturday, at about 12:00PM CDT. Between Exit 18: University Avenue (near Lauderdale) and Exit 24: Ramsey County Road C (Saint Anthony). Night time construction work is in progress. The exit ramp is closed. The entrance ramp is closed. There are alternating lane closures. Until October 1, 2018 at about 1:00PM CDT. Between Exit 252: MN 23; Central Avenue (near Proctor) and US 2 (near Duluth). The entrance ramp is closed. Follow the local detour. Road construction work is in progress. Until today at about 2:00PM CDT. Between 13th Street South and 9th Street North (near Virginia). The roadway is reduced to one lane. There is a width limit in effect. Look out for bridge demolition work. Observe the signs. Width limit 11'0". Until October 16, 2018 at about 2:00PM CDT. Between Exit 48: West Central Avenue (Medford) and Exit 69: MN 19; Lonsdale Boulevard (5 miles south of the Elko New Market area). The roadway is reduced to one lane because the road is being repaved. There is a width limit in effect. Width limit 12'0". Until Friday, at about 5:00PM CDT. Between Nichols Avenue (near Mountain Iron) and US 53 (near Virginia). The roadway is reduced to one lane. There is a width limit in effect. Look out for bridge demolition work. Road construction work is in progress. Ramp control signals are not working. Observe the signs. Width limit 11'0". Until October 23, 2018 at about 2:00PM CDT. Between MN 19 (near Henderson) and Delaware Avenue (near Jordan). Look out for construction work. Expect changing traffic patterns. Until October 30, 2018 at about 4:00AM CDT. Between Norris Lake Road Northwest and 233rd Avenue Northwest (Saint Francis). The roadway is reduced to one lane because of construction work. Look out for flaggers. From 9:00AM CDT to 3:00PM CDT on Tuesday and Wednesday. Between MN 371 and Barrows Avenue (near Baxter). The roadway is reduced to one lane. The road is being repaved. Look out for flaggers. There is a width limit in effect. Width limit 11'0". Until October 12, 2018 at about 7:00PM CDT. Between East Hayden Lake Road (Champlin) and MN 610 (Osseo). The roadway is reduced to one lane. Road construction work is in progress. Until Sunday, at about 2:00PM CDT. Between I-35; US 218 and US 218 (near Owatonna). The roadway is reduced to one lane due to bridge construction work. Short delays are possible. There is a width limit in effect. The entrance ramp is closed. Width limit 11'0". Until October 1, 2018 at about 8:00PM CDT. Between Exit 32: Steele County Road 4 (2 miles north of the Ellendale area) and Exit 40: US 14 (near Owatonna). The roadway is reduced to one lane due to road construction work and due to bridge construction work. Traffic is being held. Expect delays. There is a width limit in effect. Width limit 11'0". Until October 5, 2018 at about 8:00PM CDT. Between County Road 4 (2 miles south of the Cromwell area) and Wilson Road (3 miles north of the Cromwell area). The roadway is reduced to one lane. There is a width limit in effect. Road construction work is in progress. Look out for flaggers. Width limit 12'0". Until October 30, 2018 at about 2:00PM CDT. Between Exit 132: US 8 (near Forest Lake) and Exit 129: MN 97; Lake Drive (near Columbus). The roadway is reduced to two lanes. Major road construction work is in progress. There is a width limit in effect. Width limit 12'0". Until October 31, 2019 at about 5:00PM CDT.
MN 72: Waskish
MN 11: International Falls
MN 210: Jay Cooke
I-35: Askov
MN 60: Madelia
MN 11: Birchdale
MN 29: Starbuck
MN 7: Clara City
US 2: Cass Lake
MN 28: Graceville
MN 55: Regal
MN 61: Lafayette Tunnel
I-94: Rothsay
MN 19: New Prague
I-35: Little Chicago
US 2: East Grand Forks
I-90: Rushmore
MN 1: Shooks
MN 11: Roosevelt
I-90: Lakefield
US 53: Cotton
I-94: Dilworth
US 53: Twig
I-90: Beaver Creek
MN 25: Lastrup
MN 171: St. Vincent
MN 65: McGrath
I-94: Red River Bridge
MN 7: Silver Lake
MN 11: Donaldson
US 53: Anderson Road
MN 1: Effie
US 14: Byron
MN 200: Halstad
I-90: Blue Earth
I-35: Atkinson Bridge
US 14: Waseca
I-35: Hinckley
MN 65: Jacobson
I-35W: Minnesota River
I-494: I-494 @ Minnetonka Blvd.
US 169: Milaca
US 169: Mankato
I-94: Sauk Centre
US 10: Lake Park
MN 44: Hokah
US 169: Henderson
US 212: Marietta
I-535: Blatnik Bridge - Pier 20
US 53: Midway
US 61: Kellogg
I-494: Maple Grove
MN 6: Emily
US 59: Mahnomen
I-535: Blatnik Bridge South Abutment
I-35: Thompson Hill
I-35: Garfield Avenue
I-35: Twin Lakes
I-90: Eyota
MN 19: Hendricks
US 52: Canton
US 59: Brooks
MN 89: Gatzke
US 10: Rice
I-35: Hope
I-90: Dexter
MN 7: New Germany
US 169: St. Peter
MN 11: Badger
MN 78: Ottertail
I-94: Alexandria
I-90: Ridgeway
MN 61: Grand Portage
US 10: Verndale
US 61: Red Wing
MN 46: Squaw Lake
I-94: Clearwater
US 52: Cannon Falls
US 53: Ash Lake
MN 23: Hanley Falls
MN 61: Silver Cliff
MN 25: Mayer
US 75: Tenney
US 14: Lake Benton
I-35: Rush City
MN 23: Foley
MN 30: Dovray
MN 19: Winthrop
US 14: Waseca
US 169: Mitchell Bridge
US 71: Jeffers
MN 1: Ely
MN 64: Chamberlain
I-35E: Cayuga
US 63: Stewartville
I-35E: Little Canada
US 71: Margie
US 71: Morton
Google Static Map Image
Weather Station Weather Station Freezing Freezing Raining Raining Snowing Snowing