MN DOT 511 Traveler Information
Personalized 511 account features are available on the new 511 website. Sign in (or sign up!) and leave us feedback.
Weather Stations—South Central MN
Map of South Central MN Between Exit 205: Olmsted County Road 6 and Exit 218: US 52 (near Stewartville). The roadway is reduced to one lane. Look out for construction work. Short delays are possible. There is a width limit in effect. Width limit 11'0". Until August 27, 2021 at about 5:00PM CDT. Between Exit 28: Hemlock Lane (near Maple Grove) and Exit 207: MN 101; Main Street (Rogers). The roadway is reduced to one lane. Look out for construction work. Between Birch Street (Nicollet) and 371st Avenue (near Kasota). The road is closed due to road construction work. A detour is in operation. There is a width limit in effect. Width limit 11'0". Until August 13, 2021 at about 5:00PM CDT. Between Nason Parkway Northeast and I-94 (near Rogers). The roadway is reduced to one lane. Road construction work is in progress. Expect changing traffic patterns. Look out for flaggers. There is a width limit in effect. Width limit 12'0". Until October 31, 2021 at about 12:00PM CDT. Between Nobles Street and Kragness Avenue (Worthington). The road is closed due to road construction work. A detour is in operation. There is a width limit in effect. There is a length limit in effect. There is an axle load limit in effect. Width limit 10'0". Axle weight limit 20,000.00 lbs. Vehicle length limit 75.00 ft. Until October 1, 2021 at about 6:00PM CDT. Between Southeast 44th Avenue and Southeast 54th Avenue (1 to 2 miles east of the Owatonna area). The roadway is reduced to one lane. There is head to head traffic on the roadway. Look out for construction work. Until November 1, 2021 at about 5:00PM CDT. Between South 1st Street and Southeast 2nd Street (near Minneapolis). The bridge is closed. Bridge construction work is in progress. Follow the detour signs. Until November 18, 2022 at about 6:00PM CDT. Between Exit 194: CR 18 and Exit 205: MN 241 (near Albertville). Look out for construction work. There is a width limit in effect. Width limit 11'0". Until October 31, 2021 at about 12:00PM CDT. Between MN 36 (Lauderdale) and Exit 31: Lake Drive (Lexington). The road is being reconstructed. Follow the signs. There is a width limit in effect because of construction work. Width limit 13'0". Between 21st Street (1 mile south of the Red Wing area) and US 63; West 3rd Street (near Red Wing). The roadway is reduced to one lane. There is head to head traffic on the roadway. Road construction work is in progress. Expect delays. There is a weight limit in effect. No vehicles over 80,000.00 lbs. Until October 31, 2021 at about 5:00PM CDT. Between Hudson Road South and Valley Creek Road (near Afton). The road is closed. Road construction work is in progress. Until August 16, 2021 at about 6:00PM CDT. Between Exit 36: Anoka County Road 23 / Lake Drive (Lino Lakes) and MN 36 (Lauderdale). The roadway is reduced to one lane. Night time construction work is in progress. Until today at about 5:00AM CDT. Between Exit 36: Anoka County Road 23 / Lake Drive (Lino Lakes) and MN 36 (Lauderdale). The roadway is reduced to one lane. Night time construction work is in progress. Until today at about 5:00AM CDT. Between Fish Lake Road and Exit 27: I-94 (Maple Grove). The roadway is reduced to one lane. Look out for construction work. Between MN 36 (Lauderdale) and Exit 36: Anoka County Road 23 / Lake Drive (Circle Pines). The roadway is reduced to one lane. Night time construction work is in progress. Width limit 13'0". Until today at about 5:00AM CDT. Between MN 62 (Mendota Heights) and Wentworth Avenue West (Lilydale). The road is closed. Utility work is in progress. Follow the detour signs. Until August 24, 2021 at about 3:00PM CDT. Between MN 252 and Exit 225: MN 100 (Brooklyn Center). The roadway is reduced to one lane. Bridge construction work is in progress. Until September 2, 2021 at about 5:00AM CDT. Between Exit 34: Shingle Creek Parkway and MN 252 (Brooklyn Center). Roadway reduced to one lane. Road construction. Starting tomorrow at 5:00AM CDT until tomorrow at about 12:00PM CDT. Between 6th Street Southeast and 24th Street Southeast (Willmar). The roadway is reduced to one lane. Road construction work is in progress. Expect delays. Until Monday, at about 5:00PM CDT. Between Western Avenue and Ramsey County Road 33 (Saint Paul). The roadway is reduced to two lanes because the road is being repaved. Until November 1, 2021 at about 6:00AM CDT. Between Exit 32: 95th Avenue (Lexington) and Exit 26: Ramsey County Road E2 (New Brighton). The roadway is reduced to one lane because of night time construction work. From 8:00PM CDT to 5:00AM CDT on Monday, Tuesday, Wednesday and Thursday. Until September 2, 2021 at about 6:00AM CDT. Between CR 36 and Kelly Avenue (near Cologne). The roadway is reduced to one lane. Until October 1, 2021 at about 5:00PM CDT. Between Penn Avenue South and Portland Avenue (Richfield). The road is closed because of construction work. Until Monday, at about 6:00AM CDT. Between MN 56 and MN 56; MN 956A (near Dodge Center). The roadway is reduced to one lane. There is head to head traffic on the roadway. Look out for construction work. There is a width limit in effect. Width limit 11'0". Until October 1, 2022 at about 12:00PM CDT. Between County Road 92 (Independence) and CR 6 (near Orono). The road is closed. Road construction work is in progress. A detour is in operation. Until September 17, 2021 at about 6:00AM CDT. Between Manning Avenue North and Exit 17: Stillwater Boulevard North (near Stillwater). The roadway is reduced to one lane because of construction work. From 7:00AM CDT to 1:00PM CDT on Monday, Tuesday, Wednesday and Thursday. Between 20th Street Northwest and 85th Street Southeast (near Stewartville). The roadway is reduced to one lane. There is head to head traffic on the roadway. Bridge construction work is in progress. There is a width limit in effect. Width limit 11'0". Until October 30, 2021 at about 5:00PM CDT. Between Morlock Drive (Jordan) and Baseline Avenue (1 mile west of the Prior Lake area). The road is closed. Look out for construction work. Until August 6, 2021 at about 11:59PM CDT. Between East Old Shakopee Road (near Richfield) and MN 13 (near Eagan). The roadway is reduced to one lane. Expect changing traffic patterns. Look out for construction work. Until today at about 5:00AM CDT. Between Lyman Boulevard and MN 5 (Chanhassen). The road is closed. Look out for gas main work. Until Monday, at about 8:00AM CDT. Between Brockton Lane (near Dayton) and Exit 207: MN 101; Main Street (Rogers). A lane is closed due to road construction work. From 4:00AM CDT to 11:00AM CDT on weekdays. Between Exit 50: MN 264 (8 miles east of the Worthington area) and Exit 73: US 71 (near Lakefield). The roadway is reduced to one lane due to road construction work. There is a width limit in effect. Speed restrictions are in force. Width limit 11'0". Speed limit 60.00 MPH. Until October 1, 2021 at about 6:00PM CDT. Between 365th Street and County Road 20 (1 to 4 miles south of the Paynesville area). The roadway is reduced to one lane. Bridge maintenance work is in progress. Look out for flaggers. Look out for temporary traffic lights. There is a width limit in effect. Width limit 12'0". Until July 30, 2021 at about 4:30PM CDT. Between US 14; 615th Avenue (near Eagle Lake) and 1st Street North (Elysian). The road is closed due to road construction work. A detour is in operation. Until July 30, 2021 at about 6:00PM CDT. Between I-94 (Minneapolis) and MN 62 (near Mendota). The roadway is reduced to one lane. Night time construction work is in progress. Until tomorrow at about 6:00AM CDT. Between Brockton Lane (near Dayton) and Exit 207: MN 101; Main Street (Rogers). The roadway is reduced to two lanes due to road construction work. From 4:00AM CDT to 12:00PM CDT on weekdays. Between MN 19 and 280th Street East (near Cannon Falls). The roadway is reduced to one lane. Bridge construction work is in progress. Until July 29, 2021 at about 5:00PM CDT. Between US 169 and MN 100 (near Golden Valley). Road construction work is in progress. A lane is closed intermittently. From 9:00AM CDT to 3:00PM CDT on weekdays. Until September 2, 2021 at about 6:00PM CDT. Between MN 252 and Exit 34: Shingle Creek Parkway (Brooklyn Center). Roadway reduced to one lane. Road construction. Starting tomorrow at 5:00AM CDT until tomorrow at about 9:00AM CDT. Between I-494 and Armour Avenue (South Saint Paul). A lane is blocked. Expect changing traffic patterns. The traffic signal is flashing red. Look out for construction work. Until July 30, 2021 at about 5:00PM CDT. Between East Elysian Lake Road (Elysian) and MN 13 (Waterville). The road is closed due to road construction work. A detour is in operation. Until July 30, 2021 at about 5:00PM CDT. Between MN 7 (Excelsior) and MN 5 (Chanhassen). A lane is closed due to road construction work. From 8:00AM CDT to 4:00PM CDT on Tuesday and Wednesday. Between Exit 30: US 10 (Mounds View) and Exit 25: Ramsey County Road 88 (New Brighton). The roadway is reduced to one lane because of construction work. From 8:00PM CDT to 5:00AM CDT on Monday, Tuesday, Wednesday and Thursday. Until September 2, 2021 at about 6:00AM CDT. Between US 71B (near Willmar) and MN 23 (near Spicer). The roadway is reduced to one lane. Road construction work is in progress. Look out for flaggers. There is a width limit in effect. Width limit 11'0". Until September 3, 2021 at about 7:00PM CDT. Between MN 13; MN 21 and County Road 37 (New Prague). The road is closed because of construction work. A detour is in operation. Until October 15, 2021 at about 5:00PM CDT. Between 190th Street East (1 mile south of the Hastings area) and US 61 (Hastings). The road is closed. Look out for construction work. Until October 15, 2021 at about 4:00PM CDT. Between Hennepin County Road 61 (Plymouth) and US 169 (near Golden Valley). The roadway is reduced to one lane. Road maintenance work is in progress. A lane is closed intermittently. Until August 30, 2021 at about 5:00PM CDT. Between US 63; White Bridge Road Northeast (6 miles west of the Elgin area) and MN 42; East Broadway (Plainview). The road is closed. Look out for construction work. A detour is in operation. Consider using an alternate route. Until October 30, 2021 at about 5:00PM CDT. Between Simonet Drive Northwest and Jackson Avenue Northwest (Elk River). The roadway is reduced to one lane. There is head to head traffic on the roadway. Look out for flaggers. There is a width limit in effect. Width limit 11'0". Until November 8, 2021 at about 5:00PM CDT. Between Exit 178: MN 24 (Clearwater) and Exit 205: MN 241 (near Rogers). Look out for construction work. Until October 31, 2021 at about 7:00AM CDT.
US 212: Hector
I-494: I-494 @ Minnetonka Blvd.
US 169: Henderson
MN 7: Silver Lake
MN 25: Mayer
I-35: Hope
MN 23: Hanley Falls
MN 19: New Prague
MN 68: Milroy
US 61: Red Wing
US 71: Jeffers
US 12: Atwater
I-35: Twin Lakes
US 63: Stewartville
I-90: Dexter
MN 30: Dovray
US 71: Morton
MN 7: New Germany
US 14: Waseca
I-90: Lakefield
I-35: Little Chicago
US 169: Mankato
MN 19: Winthrop
US 14: Waseca
US 169: St. Peter
I-90: Blue Earth
US 14: Byron
I-35W: Minnesota River
US 52: Cannon Falls
I-35E: Little Canada
I-90: Eyota
I-494: Maple Grove
I-35E: Cayuga
MN 60: Madelia
MN 7: Clara City
Google Static Map Image
Weather Station Weather Station Freezing Freezing Raining Raining Snowing Snowing