MN DOT 511 Traveler Information
Personalized 511 account features are available on the new 511 website. Sign in (or sign up!) and leave us feedback.
Weather Stations—Southeast MN
Map of Southeast MN Between Manning Avenue North and Exit 17: Stillwater Boulevard North (near Stillwater). The roadway is reduced to one lane because of construction work. From 7:00AM CST to 1:00PM CST on Monday, Tuesday, Wednesday and Thursday. Between South 1st Street and Southeast 2nd Street (near Minneapolis). The bridge is closed. Bridge construction work is in progress. Follow the detour signs. Until November 18, 2022 at about 6:00PM CST. Between East 26th Street and East 35th Street (Minneapolis). A lane is closed because of work on underground services. From 9:00AM CST to 3:00PM CST on Wednesday, Thursday and Friday. Between 4th Grant Boulevard West and Wisconsin State Line (Wabasha). The roadway is reduced to one lane. Bridge construction work is in progress. Look out for flaggers. There is a width limit in effect. Width limit 12'0". Until December 22, 2021 at about 7:00PM CST. Between MN 7 (Excelsior) and MN 5 (Chanhassen). A lane is closed due to road construction work. From 8:00AM CST to 4:00PM CST on Tuesday and Wednesday. Between County Road 92 and Lake Sarah Road (Independence). There is work on the shoulder. Look out for construction work. Width limit 11'0". Until April 17, 2022 at about 3:00PM CST. Between Exit 207: MN 101; Main Street (Rogers) and Exit 215: Weaver Lake Road (Maple Grove). The roadway is reduced to two lanes. Road construction work is in progress. Until Friday, at about 2:00PM CST. Between MN 56 and MN 56; MN 956A (near Dodge Center). The roadway is reduced to one lane. There is head to head traffic on the roadway. Look out for construction work. There is a width limit in effect. Width limit 11'0". Until October 1, 2022 at about 12:00PM CST. Between Skunk Hollow Trail and 100th Avenue (1 to 4 miles south of the Cannon Falls area). The roadway is reduced to one lane. Look out for construction work. Until tomorrow at about 4:00PM CST. Between Brockton Lane (near Dayton) and Exit 207: MN 101; Main Street (Rogers). The roadway is reduced to two lanes because of construction work. Between Exit 207: MN 101; Main Street (Rogers) and Brockton Lane (near Dayton). The roadway is reduced to two lanes. Look out for construction work.
US 169: St. Peter
I-90: Blue Earth
US 63: Stewartville
I-90: Dexter
I-35E: Cayuga
US 169: Henderson
I-35W: Minnesota River
US 52: Cannon Falls
US 61: Red Wing
MN 7: Silver Lake
I-35: Twin Lakes
I-35: Hope
MN 25: Mayer
I-35: Little Chicago
MN 60: Madelia
I-494: I-494 @ Minnetonka Blvd.
MN 7: New Germany
US 14: Waseca
MN 19: New Prague
I-90: Ridgeway
US 52: Canton
I-90: Eyota
I-494: Maple Grove
US 14: Byron
US 61: Kellogg
US 169: Mankato
I-35E: Little Canada
MN 44: Hokah
Google Static Map Image
Weather Station Weather Station Freezing Freezing Raining Raining Snowing Snowing