MN DOT 511 Traveler Information
Personalized 511 account features are available on the new 511 website. Sign in (or sign up!) and leave us feedback.
Weather Stations—Southwest MN
Map of Southwest MN Between Nobles Street and County Road 33 (Worthington). The road is closed due to road construction work. A detour is in operation. There is a width limit in effect. There is a length limit in effect. There is an axle load limit in effect. Width limit 10'0". Vehicle length limit 75.00 ft. Axle weight limit 20,000.00 lbs. Until October 1, 2021 at about 6:00PM CDT. Between 115th Street Northeast and 130th Street Northeast (1 mile east of the New London area). The roadway is reduced to one lane. Road construction work is in progress. Look out for flaggers. Expect delays. From 7:00AM CDT to 7:00PM CDT on Monday, Tuesday and Wednesday. Until today at about 7:00PM CDT. Between Birch Street (Nicollet) and 371st Avenue (near Kasota). The road is closed due to road construction work. A detour is in operation. There is a width limit in effect. Width limit 11'0". Until August 13, 2021 at about 5:00PM CDT. Between Exit 178: MN 24 and Exit 183: Wright County Road 8 (near Clearwater). The roadway is reduced to one lane. Night time construction work is in progress. Look out for flaggers. Expect delays. Until September 6, 2021 at about 12:00PM CDT. Between County Road 55 and 30th Street Southwest (near Willmar). The road is closed. Bridge construction work is in progress. Follow the detour signs. Until October 1, 2021 at about 7:00PM CDT. Between Exit 50: MN 264 (8 miles east of the Worthington area) and Exit 73: US 71 (near Lakefield). The roadway is reduced to one lane due to road construction work. There is a width limit in effect. Speed restrictions are in force. Width limit 11'0". Speed limit 60.00 MPH. Until October 1, 2021 at about 6:00PM CDT. Between US 75 (Ortonville) and US 59 (near Holloway). The road is closed. Road construction work is in progress. A detour is in operation. Until October 17, 2021 at about 7:00PM CDT. Between MN 67 and 310th Avenue (near Clarkfield). The road is closed. Look out for construction work. A detour is in operation. Until July 26, 2021 at about 7:00AM CDT. Between Exit 1: MN 23 (Beaver Creek) and Exit 12: US 75 (Luverne). The roadway is reduced to one lane due to road construction work. There is a width limit in effect. Width limit 10'0". Until September 2, 2021 at about 5:00PM CDT. Between Franklin Street and 240th Street (Adrian). The road is closed due to road construction work and due to bridge construction work. A detour is in operation. Until July 30, 2021 at about 5:00PM CDT. Between Franklin Street and 240th Street (Adrian). The road is closed due to road construction work and due to bridge construction work. A detour is in operation. Until July 30, 2021 at about 5:00PM CDT. Between MN 15 (Madelia) and Lilly Street (Lake Crystal). The road is closed due to road construction work. A detour is in operation. There is a width limit in effect. There is a length limit in effect. Vehicle length limit 70.00 ft. Width limit 11'0". Until July 14, 2021 at about 8:00AM CDT. Between Exit 178: MN 24 (Clearwater) and Exit 205: MN 241 (near Rogers). Look out for construction work. Until October 31, 2021 at about 7:00AM CDT.
US 12: Holloway
I-90: Blue Earth
MN 19: Winthrop
US 169: Mankato
US 212: Hector
US 14: Florence
I-90: Rushmore
MN 23: Hanley Falls
I-94: Clearwater
MN 19: Hendricks
MN 9: Murdock
US 71: Jeffers
MN 30: Dovray
I-90: Lakefield
MN 7: Silver Lake
US 75: Ortonville
US 71: Morton
US 75: Canby
US 12: Atwater
US 212: Dawson
MN 68: Taunton
US 212: Marietta
MN 7: Clara City
US 75: Trosky
MN 60: Madelia
I-90: Beaver Creek
US 14: Lake Benton
MN 68: Milroy
Google Static Map Image
Weather Station Weather Station Freezing Freezing Raining Raining Snowing Snowing