MN DOT 511 Traveler Information
Personalized 511 account features are available on the new 511 website. Sign in (or sign up!) and leave us feedback.
Weather Stations—Southeast MN
Map of Southeast MN Between Manning Avenue North and Exit 17: Stillwater Boulevard North (near Stillwater). The roadway is reduced to one lane because of construction work. From 7:00AM CST to 1:00PM CST on Monday, Tuesday, Wednesday and Thursday. Between Exit 32: 95th Avenue (Lexington) and MN 36 (Lauderdale). The roadway is reduced to two lanes. Night time construction work is in progress. Until tomorrow at about 5:00AM CST. Between MN 316 and 4th Street East (Hastings). The roadway is reduced to one lane. Utility work is in progress. Until Wednesday, at about 3:00PM CST. Between South 1st Street and Southeast 2nd Street (near Minneapolis). The bridge is closed. Bridge construction work is in progress. Follow the detour signs. Until November 18, 2022 at about 6:00PM CST. Between I-494 and East 66th Street (Richfield). Look out for construction work. Width limit 11'0". No vehicles over 80,000 lbs. Vehicle length limit 65 ft. Until July 15, 2022 at about 3:00PM CST. Between Victoria Street (Shoreview) and Exit 46: I-35E (Little Canada). The roadway is reduced to two lanes. Look out for construction work. Until tomorrow at about 5:00AM CST. Between 4th Grant Boulevard West and Wisconsin State Line (Wabasha). The roadway is reduced to one lane. Bridge construction work is in progress. Look out for flaggers. There is a width limit in effect. Width limit 12'0". Until December 22, 2021 at about 7:00PM CST. Between MN 7 (Excelsior) and MN 5 (Chanhassen). A lane is closed due to road construction work. From 8:00AM CST to 4:00PM CST on Tuesday and Wednesday. Between Exit 207: MN 101; Main Street (Rogers) and Exit 216: I-494; I-694 (Maple Grove). The roadway is reduced to two lanes. Look out for construction work. From 9:00AM CST to 2:00PM CST on weekdays. Until Friday, at about 2:00PM CST. Between County Road 92 and Lake Sarah Road (Independence). There is work on the shoulder. Look out for construction work. Width limit 11'0". Until April 17, 2022 at about 3:00PM CST. Between MN 156; Concord Street and Butler Avenue (West Saint Paul). The roadway is reduced to one lane because of construction work. From 7:00PM CST to 6:00AM CST on Monday, Tuesday and Wednesday. Between MN 56 and MN 56; MN 956A (near Dodge Center). The roadway is reduced to one lane. There is head to head traffic on the roadway. Look out for construction work. There is a width limit in effect. Width limit 11'0". Until October 1, 2022 at about 12:00PM CST. Between Brockton Lane (near Dayton) and Exit 207: MN 101; Main Street (Rogers). The roadway is reduced to two lanes because of construction work. Between Exit 207: MN 101; Main Street (Rogers) and Brockton Lane (near Dayton). The roadway is reduced to two lanes. Look out for construction work.
I-494: Maple Grove
I-90: Ridgeway
I-90: Blue Earth
I-90: Dexter
I-35W: Minnesota River
US 169: St. Peter
MN 7: New Germany
US 52: Cannon Falls
I-35E: Cayuga
I-35: Twin Lakes
MN 7: Silver Lake
US 169: Henderson
I-35: Little Chicago
MN 60: Madelia
US 61: Red Wing
I-494: I-494 @ Minnetonka Blvd.
MN 19: New Prague
I-90: Eyota
US 14: Waseca
US 63: Stewartville
US 52: Canton
US 169: Mankato
MN 44: Hokah
I-35E: Little Canada
I-35: Hope
MN 25: Mayer
US 14: Byron
US 61: Kellogg
Google Static Map Image
Weather Station Weather Station Freezing Freezing Raining Raining Snowing Snowing