MN DOT 511 Traveler Information
Personalized 511 account features are available on the new 511 website. Sign in (or sign up!) and leave us feedback.
Weather Stations—Southeast MN
Map of Southeast MN Between Exit 31: Hennepin County Road 81 (near Brooklyn Park) and Exit 215: Weaver Lake Road (Maple Grove). The roadway is reduced to two lanes. Road construction work is in progress. Width limit 11'0". Until Saturday, at about 9:00AM CDT. Between Old River Bluff Road and MN 295; Freeman Drive (near Kasota). The roadway is reduced to one lane because of construction work. Until October 30, 2021 at about 6:00PM CDT. Between 2nd Avenue Northeast (Winnebago) and Kendall Street (Vernon Center). The roadway is reduced to one lane due to road construction work. Look out for flaggers. There is a width limit in effect. Width limit 11'0". Until October 2, 2021 at about 8:00PM CDT. Between Exit 6: 98th Street and Exit 5: 106th Street (Bloomington). Roadway reduced to two lanes. Bridge maintenance operations. Starting tomorrow at 8:00AM CDT until tomorrow at about 2:30PM CDT. Between Southeast 44th Avenue and Southeast 54th Avenue (1 to 2 miles east of the Owatonna area). The roadway is reduced to one lane. There is head to head traffic on the roadway. Look out for construction work. Until November 1, 2021 at about 5:00PM CDT. Between Columbia Pkwy and 35th Avenue Northeast (Columbia Heights). The roadway is reduced to one lane. Look out for construction work. Until October 17, 2021 at about 5:00PM CDT. Between Exit 207: MN 101; Main Street (Rogers) and MN 610 (near Maple Grove). The roadway is reduced to one lane. Bridge construction work is in progress. From 9:00PM CDT to 5:00AM CDT on weekdays. Until Friday, at about 5:00AM CDT. Between South 1st Street and Southeast 2nd Street (near Minneapolis). The bridge is closed. Bridge construction work is in progress. Follow the detour signs. Until November 18, 2022 at about 6:00PM CDT. Between 21st Street (1 mile south of the Red Wing area) and US 63; West 3rd Street (near Red Wing). The roadway is reduced to one lane. There is head to head traffic on the roadway. Road construction work is in progress. Expect delays. There is a weight limit in effect. No vehicles over 80,000 lbs. Until October 31, 2021 at about 5:00PM CDT. Between 490th Street (near Pine Island) and MN 58 (Zumbrota). The roadway is reduced to one lane. Bridge construction work is in progress. There is head to head traffic on the roadway. There is a width limit in effect. Width limit 12'0". Until December 3, 2021 at about 7:00PM CDT. Between Western Avenue and Ramsey County Road 33 (Saint Paul). The roadway is reduced to two lanes because the road is being repaved. Until November 1, 2021 at about 6:00AM CDT. Between MN 156; Concord Street and Butler Avenue (West Saint Paul). The roadway is reduced to one lane because of construction work. From 7:00PM CDT to 6:00AM CDT on Monday, Tuesday and Wednesday. Between MN 55; 5th Street and Groveland Avenue (Minneapolis). The roadway is reduced to one lane. Look out for construction work. Until Friday, at about 10:00PM CDT. Between Exit 59: MN 21; Lyndale Avenue (Faribault) and Exit 76: Deuce Road (Elko New Market). The roadway is reduced to one lane. Night time construction work is in progress. There is a width limit in effect. Width limit 11'0". From 7:00PM CDT to 5:00AM CDT daily. Until October 15, 2021 at about 5:00AM CDT. Between CR 36 and Kelly Avenue (near Cologne). The roadway is reduced to one lane. Until October 1, 2021 at about 5:00PM CDT. Between MN 56 and MN 56; MN 956A (near Dodge Center). The roadway is reduced to one lane. There is head to head traffic on the roadway. Look out for construction work. There is a width limit in effect. Width limit 11'0". Until October 1, 2022 at about 12:00PM CDT. Between Manning Avenue North and Exit 17: Stillwater Boulevard North (near Stillwater). The roadway is reduced to one lane because of construction work. From 7:00AM CDT to 1:00PM CDT on Monday, Tuesday, Wednesday and Thursday. Between 20th Street Northwest and 85th Street Southeast (near Stewartville). The roadway is reduced to one lane. There is head to head traffic on the roadway. Bridge construction work is in progress. There is a width limit in effect. Width limit 11'0". Until October 30, 2021 at about 5:00PM CDT. Between Oak Street (Excelsior) and I-494 (Minnetonka). The roadway is reduced to one lane. Look out for construction work. Until October 4, 2021 at about 6:00AM CDT. Between Church St East and Benton Creek Avenue (Cologne). The road is closed. Follow the detour signs. Until October 1, 2021 at about 3:00PM CDT. Between Laurie Lane and Jonathan Carver Parkway (near Carver). Road construction work is in progress. There is a width limit in effect. Look out for flaggers. Width limit 11'0". Until October 31, 2021 at about 3:00PM CDT. Between Baseline Avenue (1 mile west of the Prior Lake area) and MN 13 (near Prior Lake). The road is closed to traffic. Look out for construction work. Until October 30, 2021 at about 5:00AM CDT. Between Valley Creek Road and Scenic Lane (near Afton). The road is closed. Road construction work is in progress. Until Friday, at about 6:00PM CDT. Between 1st Street North (Elysian) and MN 13 (Waterville). The road is closed due to road construction work. A detour is in operation. Until October 1, 2021 at about 5:00PM CDT. Between Christmas Lake Road (Greenwood) and Carlysle Place (Deephaven). The roadway is reduced to one lane. Road construction work is in progress. Until September 27, 2021 at about 6:00AM CDT. Between MN 7 (Excelsior) and MN 5 (Chanhassen). A lane is closed due to road construction work. From 8:00AM CDT to 4:00PM CDT on Tuesday and Wednesday. Between Kenilworth Avenue North (Lanesboro) and MN 30; County Highway 32 (3 miles north of the Whalan area). The road is closed. Look out for construction work. The road is being repaved. A detour is in operation. Until Friday, at about 7:00PM CDT. Between MN 13; MN 21 and County Road 37 (New Prague). The road is closed because of construction work. A detour is in operation. Until October 15, 2021 at about 5:00PM CDT. Between 190th Street East (1 mile south of the Hastings area) and US 61 (Hastings). The road is closed. Look out for construction work. Until October 15, 2021 at about 4:00PM CDT. Between St Charles Twp Rd 9 (near Saint Charles) and County Road 39 (Elba). The road is closed. Bridge construction work is in progress. A detour is in operation. There is a width limit in effect. Width limit 11'0". Until October 30, 2021 at about 5:00PM CDT. Between Exit 207: MN 101; Main Street (Rogers) and Brockton Lane (near Dayton). The roadway is reduced to two lanes. Look out for construction work. Between 571st Avenue and Brown Street North (Winthrop). Roadway reduced to one lane due to road construction work. Look out for flaggers. Width limit in effect. Width limit 10'0". From 7:00AM CDT to 7:00PM CDT on Tuesday, Wednesday and Thursday. Starting September 21, 2021 at 7:00AM CDT until September 23, 2021 at about 7:00PM CDT.
MN 7: New Germany
I-35: Twin Lakes
MN 19: New Prague
I-90: Dexter
I-35E: Cayuga
US 63: Stewartville
US 14: Waseca
I-35: Little Chicago
MN 60: Madelia
US 61: Red Wing
US 169: Henderson
I-90: Blue Earth
US 52: Cannon Falls
I-35W: Minnesota River
US 14: Byron
US 61: Kellogg
I-494: I-494 @ Minnetonka Blvd.
US 169: St. Peter
I-35E: Little Canada
MN 7: Silver Lake
I-90: Ridgeway
I-90: Eyota
I-494: Maple Grove
US 169: Mankato
I-35: Hope
MN 25: Mayer
MN 44: Hokah
US 52: Canton
US 14: Waseca
Google Static Map Image
Weather Station Weather Station Freezing Freezing Raining Raining Snowing Snowing