MN DOT 511 Traveler Information
Weather Stations—South Central MN
Map of South Central MN Between Exit 125: Interlachen Road (Hopkins) and Exit 130AB: I-394 (near Golden Valley). The roadway is reduced to one lane. Major road construction work is in progress. Until September 1, 2017 at about 5:00AM CDT. Between Exit 124AB: MN 62 (Edina) and Exit 125: Interlachen Road (Hopkins). The road is closed. Major road construction work is in progress. Until October 31, 2017 at about 10:00PM CDT. Between US 52 and East 14th Street (near Zumbrota). The roadway is reduced to one lane due to road construction work and due to bridge construction work. There is a width limit in effect. Width limit 11'0". Until October 13, 2017 at about 7:00PM CDT. Between Exit 32: Steele County Road 4 (3 miles north of the Ellendale area) and Exit 41: Bridge Street (near Owatonna). The roadway is reduced to one lane due to bridge construction work. Traffic is being held. Expect delays. There is a width limit in effect. Width limit 11'0". Speed limit 60 MPH. Until September 15, 2017 at about 12:00PM CDT. Between 20th Street South and US 14; 7th St N (near New Ulm). The road is closed. The bridge is closed. Road construction work is in progress. Bridge construction work is in progress. A detour is in operation. Work on underground services is in progress. There is work on the shoulder. Until September 29, 2017 at about 4:00PM CDT. Between Exit 42A-B: US 10; North Snelling; Hamline Avenue (Arden Hills) and Exit 45: Rice Street (Vadnais Heights). The roadway is reduced to two lanes. The entrance ramp is closed due to road construction work. Follow the detour signs. There is a width limit in effect. Width limit 11'0". Until September 29, 2017 at about 6:00PM CDT. Between West Taylor Avenue (Falcon Heights) and MN 36 (Roseville). The roadway is reduced to one lane because of major road construction work. Expect very long delays. Consider using an alternate route. Until October 16, 2017 at about 5:00PM CDT. Between MN 23 (Marshall) and MN 67 (near Vesta). The roadway is reduced to one lane. Road construction work is in progress. The road is being repaved. A pilot car is in operation. Look out for flaggers. Traffic is being held. Expect delays. There is a width limit in effect. Width limit 12'0". Until October 20, 2017 at about 8:30PM CDT. Between 160th Avenue (Echo) and MN 19 (near Vesta). The roadway is reduced to one lane. Road construction work is in progress. The road is being repaved. A pilot car is in operation. Look out for flaggers. Traffic is being held. Expect delays. There is a width limit in effect. Width limit 12'0". Until October 20, 2017 at about 8:30PM CDT. Between 145th Street West and MN 41; Chestnut Boulevard (near Carver). The left lane is closed. From 7:00AM CDT to 8:00PM CDT on weekends. Between 8th Avenue South and 7th Street South (near Saint James). The road is closed to traffic. The road is being reconstructed. A detour is in operation. There is a width limit in effect. There is a weight limit in effect. Follow the detour signs. Width limit 10'0". No vehicles over 80000 lbs. Until November 6, 2017 at about 1:30PM CDT. Between North Range Road (Springfield) and MN 4 (Sleepy Eye). The road is closed. A detour is in operation. Road construction work is in progress. Follow the detour signs. Until September 20, 2017 at about 2:30PM CDT. Between I-35; US 218 and US 218 (near Owatonna). The exit ramp is closed. The roadway is reduced to one lane. Road construction work is in progress. A detour is in operation. Short delays are possible. There is a width limit in effect. Width limit 11'0". Until November 15, 2017 at about 11:59PM CDT. Between Pheasant Avenue and 150th Street (near Fairmont). Look out for construction work. There is a width limit in effect. Width limit 12'0". Until October 27, 2017 at about 12:00PM CDT. Between County 14 Boulevard and MN 19 (near Cannon Falls). The left lane is closed. The roadway is reduced to one lane. The bridge is closed due to bridge construction work. Expect long delays. There is a width limit in effect. A mandatory speed limit is in force. Speed limit 55 MPH. Width limit 10'0". Until October 20, 2017 at about 7:00PM CDT. Between MN 60 and Golf Club Road (near Kenyon). The roadway is reduced to one lane. There are alternating lane closures due to bridge construction work. Short delays are possible. Width limit 11'0". Until October 13, 2017 at about 7:00PM CDT. Between Exit 64: MN 86 (near Lakefield) and Exit 93: MN 263 (Sherburn). The roadway is reduced to one lane. Road construction work is in progress. Reduce your speed. There is a width limit in effect. Width limit 10'0". Until September 1, 2017 at about 7:00PM CDT. Between Exit 35B: I-694 (Brooklyn Center) and Exit 231A: I-394 (Minneapolis). The roadway is reduced to two lanes. Major road construction work is in progress. There is a width limit in effect. Expect delays. Width limit 11'0". Until October 31, 2017 at about 6:00PM CDT. Between I-494 (Sunfish Lake) and I-35E (Mendota Heights). The road is closed because of road maintenance activities. Until October 2, 2017 at about 5:00AM CDT. Between East Blue Earth Avenue and East 10th Street (near Fairmont). Road maintenance operations. Detour in operation. Width limit in effect. Width limit 12'0". Starting August 22, 2017 at 7:00AM CDT until August 25, 2017 at about 4:00PM CDT. Between MN 19 (Morton) and US 212; North 13th Street (Olivia). There are alternating lane closures. Road construction work is in progress. The road is being repaved. A pilot car is in operation. Until September 15, 2017 at about 10:00PM CDT. Between Exit 6B (near Bloomington) and Exit 7: MN 100; Normandale Boulevard (near Edina). The roadway is reduced to two lanes. Night time construction work is in progress. From 10:00PM CDT to 4:00AM CDT on weekends, Monday, Wednesday, Thursday and Friday. Until Friday, at about 5:00AM CDT. Between MN 41; Chestnut Boulevard and 145th Street West (near Carver). The right lane is closed. From 7:00AM CDT to 8:00PM CDT on weekends. Between Exit 243: Mounds Boulevard (Saint Paul) and Exit 247A: MN 120; Century Avenue (near Oakdale). Major road construction work is in progress. Until August 31, 2017 at about 5:00PM CDT. Between Exit 35B-C: MN 252 (Brooklyn Center) and Exit 36: East River Road (Fridley). The right lane is closed. The entrance ramp is closed. Until today at about 2:00PM CDT. Between MN 60 and MN 58 (near Zumbrota). The roadway is reduced to one lane due to road construction work and due to bridge construction work. There is a width limit in effect. There is a height limit in effect. Width limit 11'0". Height limit 12'0". Until October 13, 2017 at about 7:00PM CDT. Between 22nd Street South and 15th Street South (near Afton). The road is closed. Road maintenance work is in progress. A detour is in operation. There is a width limit in effect. Width limit 11'0". Until September 15, 2017 at about 6:00AM CDT. Between Maple Avenue (Windom) and Golf Course Road (Mountain Lake). Look out for construction work. There is a width limit in effect. Width limit 10'0". Until October 31, 2017 at about 1:00PM CDT. Between 586th Avenue and MN 22 (near Mankato). The road is closed. A detour is in operation. There is a roundabout. Until September 15, 2017 at about 4:00PM CDT. Between Kimbro Avenue South and Jamaica Avenue (near Cottage Grove). The roadway is reduced to one lane. There are alternating lane closures. Bridge construction work is in progress. From 6:00AM CDT to 3:00PM CDT on weekdays. Until Friday, at about 3:00PM CDT. Between US 212 and 830th Avenue (Olivia). The road is closed to traffic. Repairs are in progress. A detour is in operation. Until August 29, 2017 at about 12:00PM CDT. Between 6th Avenue Northeast (Mapleton) and 158th Street (2 miles north of the Mapleton area). The road is closed. Major road construction work is in progress. Bridge construction work is in progress. A detour is in operation. Until November 1, 2017 at about 4:00PM CDT. Between South Front Street and French Hill Road (near Saint Peter). The bridge is closed. Bridge construction work is in progress. A detour is in operation. Until October 5, 2017 at about 4:00PM CDT. Between MN 60 and I-90 (near Worthington). The roadway is reduced to two lanes. Road construction work is in progress. There is a width limit in effect. Width limit 12'0". Until September 5, 2017 at about 11:00AM CDT. Between Golf Course Road (near Saint Peter) and South Lexington Avenue (Le Center). Road construction work is in progress. There are alternating lane closures. Follow the detour signs. Look out for flaggers. There is a width limit in effect. Short delays are possible. Width limit 13'3". Until September 8, 2017 at about 11:59PM CDT. Between 222nd Street East (Hampton) and 170th Street East (Coates). The left lane is closed. Look out for construction work. Until September 1, 2017 at about 11:45PM CDT. Between Exit 13: 46th Street and Exit 16B-C (near Minneapolis). Major road construction work is in progress. Until October 22, 2021 at about 6:00PM CDT. Between 170th Street (3 miles south of the New Ulm area) and 19th Street South (New Ulm). The road is closed. The bridge is closed. A detour is in operation. Until September 29, 2017 at about 3:30PM CDT. Between 102nd Street and Oak Avenue (near Waconia). The roadway is reduced to one lane. The left shoulder is closed. The right shoulder is closed. Until September 1, 2017 at about 5:00PM CDT. Between Exit 102: MN 13; Sibley Memorial Highway and Exit 103A (near Lilydale). The exit ramp is closed. Look out for long term road construction work. Until August 28, 2017 at about 5:00AM CDT. Between South Cherokee Avenue and West Goodrich Avenue (Saint Paul). There are alternating lane closures due to bridge construction work. From 7:00AM CDT to 5:00PM CDT on weekdays. Until September 2, 2017 at about 5:00PM CDT. Between Pine Street (Milroy) and Ideal Avenue (Wabasso). There are alternating lane closures. Road construction work is in progress. A pilot car is in operation. Look out for flaggers. There is a weight limit in effect. There is a width limit in effect. No vehicles over 80000 lbs. Width limit 12'0". Until September 11, 2017 at about 10:00PM CDT. Between 126th Street West (Savage) and Washburn Avenue South (near Burnsville). Road maintenance work is in progress. There are alternating lane closures. From 9:00AM CDT to 3:00PM CDT on weekdays. Until September 20, 2017 at about 3:00PM CDT. Between South Division Street (Clara City) and US 71 (Blomkest). The road is closed. A detour is in operation. There is a weight limit in effect. There is a width limit in effect. No vehicles over 80000 lbs. Width limit 12'0". Until September 1, 2017 at about 6:00PM CDT.
I-90: Blue Earth
I-35E: Little Canada
I-35E: Cayuga
US 52: Cannon Falls
I-35: Hope
MN 60: Madelia
I-494: I-494 @ Minnetonka Blvd.
US 169: Henderson
MN 25: Mayer
I-90: Eyota
MN 30: Dovray
US 14: Waseca
I-90: Dexter
MN 19: New Prague
US 14: Waseca
US 169: St. Peter
I-494: Maple Grove
US 169: Mankato
US 14: Byron
US 71: Morton
I-90: Lakefield
I-35W: Minnesota River
MN 19: Winthrop
MN 7: New Germany
I-35: Little Chicago
I-35: Twin Lakes
US 61: Red Wing
US 71: Jeffers
US 63: Stewartville
MN 7: Clara City
MN 7: Silver Lake
MN 23: Hanley Falls
Google Static Map Image
Weather Station Weather Station Freezing Freezing Raining Raining Snowing Snowing