MN DOT 511 Traveler Information
Check out the new 511 site and leave us feedback!
Weather Stations—Southwest MN
Map of Southwest MN Between Sunset Avenue Northwest and 60th Street Southwest (Cokato). Road construction work is in progress. Look out for flaggers. A pilot car is in operation. Expect delays. There is a width limit in effect. Width limit 11'0". Until October 23, 2020 at about 5:00PM CDT. Between US 14 and MN 22; 370th Street (6 miles north of the Nicollet area). The road is closed due to road construction work. A detour is in operation. Until September 25, 2020 at about 5:00PM CDT. Between MN 22 and County Road 34 (Litchfield). The road is closed. Look out for construction work. A detour is in operation. Until October 31, 2020 at about 8:00PM CDT. Between US 212 (2 miles south of the Madison area) and County Highway 14 (Odessa). The road is closed. The road is being repaved. Look out for flaggers. A detour is in operation. Until September 25, 2020 at about 12:00PM CDT. Between MN 111; 370th Street and 350th Street (5 to 6 miles south of the Gaylord area). The road is closed due to road construction work. A detour is in operation. Until September 25, 2020 at about 5:00PM CDT. Between East Saint Paul Street and US 12; West Depot Street (Litchfield). The road is closed. Road construction work is in progress. A detour is in operation. Until October 31, 2020 at about 8:00PM CDT. Between 5th Avenue Southwest and 2nd Avenue Southwest (Hutchinson). The road is closed to traffic. Look out for construction work. A detour is in operation. There is a width limit in effect. Short delays are possible. Width limit 11'0". Until October 31, 2020 at about 12:00PM CDT. Between 290th Avenue (near Cottonwood) and US 212; Granite Street (Granite Falls). The road is closed. Road construction work is in progress. There is a width limit in effect. A detour is in operation. Width limit 11'0". Until October 30, 2020 at about 8:00PM CDT. Between Industrial Parkway (Jackson) and MN 60 (Windom). The road is closed due to road construction work. A detour is in operation. Until August 7, 2020 at about 5:00PM CDT. Between MN 55; West Harrison Street and 90th Street Northwest (Annandale). The road is closed. Road construction work is in progress. A detour is in operation. Until November 27, 2020 at about 5:00PM CDT. Between County Road B1 and 600th Street (1 to 2 miles east of the Granite Falls area). The road is closed. The road surface has collapsed. Follow the detour signs. Until July 30, 2020 at about 6:00PM CDT. Between Exit 102: MN 15; North State Street (near Fairmont) and Exit 119: US 169 (Blue Earth). The roadway is reduced to one lane due to road construction work. There is a width limit in effect. Width limit 11'0". Until October 9, 2020 at about 5:00PM CDT. Between Exit 173: Opportunity Drive (Clearwater) and Exit 205: MN 241 (near Albertville). Road construction work is in progress. Until October 31, 2020 at about 8:00PM CDT.
MN 23: Hanley Falls
I-90: Blue Earth
MN 19: Winthrop
MN 19: Hendricks
US 14: Lake Benton
MN 30: Dovray
US 71: Morton
I-90: Rushmore
I-90: Beaver Creek
I-90: Lakefield
US 71: Jeffers
US 169: Mankato
MN 7: Silver Lake
US 212: Marietta
I-94: Clearwater
MN 7: Clara City
MN 60: Madelia
Google Static Map Image
Weather Station Weather Station Freezing Freezing Raining Raining Snowing Snowing