MN DOT 511 Traveler Information
Road Reports
I‑35 I‑35E I‑35W I‑90 I‑94 I‑494 I‑535 I‑694
See list of highways
Road Reports—South Central MN
Map of South Central MN Between Vine Hill Road and Old Market Road (Greenwood). Right lane closed. Starting tomorrow at 8:30AM CST until tomorrow at about 1:00PM CST. Between Exit 13: 46th Street and Portland Avenue South (near Minneapolis). Major road construction work is in progress. Until October 22, 2021 at about 6:00PM CST. Between MN 292 (1 mile south of the Red Wing area) and US 63; Plum Street (near Red Wing). Bridge construction work is in progress. There is a width limit in effect. Width limit 11'0". Until December 31, 2017 at about 7:00PM CST. Between 114th Avenue North (Champlin) and MN 610 (Osseo). The roadway is reduced to one lane. Road construction work is in progress. From 9:00AM CST to 6:00PM CST on Monday, Tuesday and Friday. Until today at about 6:00PM CST. Between 4th Street East and 120th Street South (near Hastings). The right lane is closed. Look out for long term road construction work. Until December 9, 2017 at about 5:00PM CST. Between South Front Street and French Hill Road (near Saint Peter). The bridge is closed. Bridge construction work is in progress. A detour is in operation. Until December 1, 2017 at about 4:00PM CST. Between MN 252 and West River Road (near Brooklyn Park). Two left lanes blocked. Road maintenance operations. Starting Tuesday at 9:00AM CST until Tuesday, at about 2:00PM CST. Between County Road 10 and 610th Avenue (3 miles south of the Fairfax area). The roadway is reduced to one lane. Road construction work is in progress. There is work on the shoulder. Look out for flaggers. Short delays are possible. There is a width limit in effect. Width limit 10'0". Until tomorrow at about 5:00PM CST. Between Exit 17C: Washington Avenue (Minneapolis) and Exit 18: University Avenue (near Lauderdale). The right lane is closed. Road construction work is in progress. From 9:00AM CST to 3:00PM CST on weekdays. For the next day. Between East Hayden Lake Road and Rice Street (Champlin). There are alternating lane closures. Road construction work is in progress. Until tomorrow at about 5:00PM CST. Between Exit 178: MN 24 (Clearwater) and Exit 193: MN 25 (Monticello). The roadway is reduced to one lane. Night time construction work is in progress. There is a width limit in effect. Width limit 12'0". From 7:00PM CST to 9:00AM CST daily. Until tomorrow at about 10:30AM CST.
I-94 eastbound: Crash.
I-35E southbound: Crash.
MN 7 westbound: Right lane closed.
I-94 eastbound: Crash.
I-94 westbound: Crash.
I-35W in both directions: Major road construction.
US 61 in both directions: Bridge construction, width limit in effect.
US 169 southbound: Roadway reduced to one lane, road construction.
US 61 northbound: Right lane closed, long term road construction.
US 169 northbound: Entrance ramp closed.
I-494 westbound: Traffic incident reported.
MN 99 in both directions: Bridge closed, bridge construction, detour in operation.
MN 610 in both directions: Two left lanes blocked, road maintenance operations.
MN 4 in both directions: Roadway reduced to one lane, road construction, work on the shoulder, look out for flaggers, short delays, width limit in effect.
I-35W northbound: Right lane closed, road construction.
US 169 in both directions: Alternating lane closures, road construction.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Roadwork/Warning Lane Closure Lane Closure
Flooding Flooding Info Info