MN DOT 511 Traveler Information
Road Reports
I‑35 I‑35E I‑35W I‑90 I‑94 I‑494 I‑535 I‑694
See list of highways
Road Reports—South Central MN
Map of South Central MN Between MN 15 and MN 15; County Road 21 (New Ulm). The road is closed because of construction work. A detour is in operation. Until October 18, 2018 at about 1:00PM CDT. Between Exit 127: I-35E; I-35W and Exit 132: US 8 (near Forest Lake). Road construction work is in progress. Look out for a new road layout. There are alternating lane closures. Until Friday, at about 5:00PM CDT. Between Exit 135: US 61; Viking Boulevard (near Wyoming) and Exit 129: MN 97; Lake Drive (near Columbus). There are alternating lane closures. Until today at about 11:00PM CDT. Between East Hayden Lake Road (Champlin) and Rice Street (Anoka). Look out for construction work. There are alternating lane closures. Expect delays. Until April 28, 2018 at about 7:00PM CDT. Between Exit 231A-B: MN 55 and Lowry Tunnel (near Minneapolis). Bridge construction work is in progress. Until August 3, 2018 at about 6:00PM CDT. Between MN 93 and 358th Street (near Le Sueur). The right lane is closed because of construction work. Until Friday, at about 1:00PM CDT. Between 114th Avenue North and East Hayden Lake Road (near Champlin). Road construction work is in progress. The roadway is reduced to one lane. Until Friday, at about 2:00PM CDT. Between West George Street and West Goodrich Avenue (near Saint Paul). The bridge is closed. Bridge construction work is in progress. Until December 27, 2018 at about 5:00PM CDT. Between Exit 13: 46th Street and Portland Avenue South (near Minneapolis). Major road construction work is in progress. Until October 22, 2021 at about 6:00PM CDT.
US 14 in both directions: Road closed, because of construction work, detour in operation.
I-35 in both directions: Road construction, new road layout, alternating lane closures.
I-35 southbound: Alternating lane closures.
US 169 in both directions: Construction work, alternating lane closures, delays.
US 10 westbound: Traffic incident reported.
I-94 in both directions: Bridge construction.
I-394 eastbound: Exit ramp closed, road construction, follow the detour signs.
US 169 southbound: Right lane closed, because of construction work.
US 169 northbound: Road construction, roadway reduced to one lane.
MN 149 in both directions: Bridge closed, bridge construction.
I-394 eastbound: Stalled vehicle, lane blocked.
US 61 northbound: Right lane closed, construction work.
I-35 in both directions: Major road construction.
I-35W in both directions: Major road construction.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Roadwork/Warning Lane Closure Lane Closure
Flooding Flooding Info Info