MN DOT 511 Traveler Information
Road Reports—Statewide
Map of Statewide Between Upland Avenue Northwest and Joplin Street Northwest (near Elk River). The right lane is closed. Utility work is in progress. From 9:00AM CST to 7:00PM CST on weekdays. Until March 30, 2018 at about 7:00PM CST. Between East Hayden Lake Road and West River Road (Champlin). The roadway is reduced to one lane. Look out for construction work. Until Monday, at about 2:00PM CST.
US 61 in both directions: Bridge construction, width limit in effect.
US 10 westbound: Right lane closed, utility work.
US 169 northbound: Roadway reduced to one lane, construction work.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Roadwork/Warning Lane Closure Lane Closure
Flooding Flooding Info Info