MN DOT 511 Traveler Information
Road Reports—Statewide
Map of Statewide Between Bourgin Road (Virginia) and County Highway 21 (5 miles north of the Aurora area). The roadway is reduced to one lane. There is a width limit in effect. Road construction work is in progress. Observe the signs. Width limit 11'0". Until September 10, 2019 at about 2:00PM CDT. Between Cedar Island Drive and Miller Trunk Road (near Eveleth). The roadway is reduced to one lane. There is a width limit in effect. Bridge construction work is in progress. Expect single line traffic alternating directions. Width limit 11'0". Until September 10, 2019 at about 2:00PM CDT. Between West 150th Street and MN 41; Chestnut Boulevard (near Carver). Look out for construction work. Bridge construction work is in progress. There are alternating lane closures. Until October 31, 2019 at about 3:00PM CDT. Between Exit 152: Chisago County Road 10 (Harris) and Exit 165: MN 70 (near Rock Creek). The roadway is shared with opposing traffic due to road construction work. There is a width limit in effect. Width limit 11'0". Until September 19, 2019 at about 6:00PM CDT. Between Exit 65: 7th Avenue (South Saint Paul) and US 61 (Newport). Road construction work is in progress. There is a width limit in effect. The roadway is reduced to two lanes. Width limit 11'0". Until August 12, 2019 at about 6:00AM CDT. Between Exit 266: Winona County Road 12 (1 mile west of the Dakota area) and Exit 229: Olmsted County Road 10 (Saint Charles). The roadway is reduced to one lane due to road construction work and due to bridge construction work. There is a width limit in effect. Speed restrictions are in force. Width limit 14'0". Speed limit 60 MPH. Until November 15, 2019 at about 5:00PM CDT. Between I-90 (Dakota) and Jefferson Street (3 miles south of the Winona area). The roadway is reduced to one lane due to road construction work. There is a width limit in effect. Speed restrictions are in force. Width limit 14'0". Speed limit 55 MPH. Until September 27, 2019 at about 8:00PM CDT. Between Ramsey County Road 96 (Arden Hills) and Exit 26: Ramsey County Road E2 (New Brighton). The roadway is reduced to two lanes. Night time construction work is in progress. Until November 14, 2019 at about 11:45PM CDT. Between Timber Trail Road and Earle Brown Drive (2 to 3 miles south of the Garrison area). Be aware of narrow lanes. Bridge maintenance work is in progress. Look out for flaggers. There is a width limit in effect. Speed restrictions are in force. Width limit 9'0". Until September 20, 2019 at about 12:00PM CDT. Between Adams Avenue Northwest (near Wilton) and MN 197; US 71 (near Bemidji). Look out for construction work. There are alternating lane closures. The road is being repaved. Look out for flaggers. Expect delays. Until Saturday, at about 6:00PM CDT. Between US 169; Quaker Avenue and East Street (Jordan). The road is being repaved. There are alternating lane closures. A pilot car is in operation. Look out for flaggers. From 8:00AM CDT to 4:00PM CDT on weekdays. Until tomorrow at about 4:00PM CDT. Between 177th Avenue Northwest (near Ramsey) and Vega Drive Northwest (near Nowthen). The roadway is reduced to one lane. Look out for flaggers. Until tomorrow at about 2:00PM CDT. Between County Road 210 (near Erskine) and Southwest Mill Street (McIntosh). The roadway is shared with opposing traffic. Look out for construction work. There is a length limit in effect. There is a width limit in effect. There is a weight limit in effect. Expect delays. Width limit 11'0". Axle weight limit 20,000 lbs. Vehicle length limit 100 ft. Until July 19, 2019 at about 7:00PM CDT. Between MN 23; West McCuen Street and Wisconsin State Line. The roadway is reduced to one lane. There is a width limit in effect. Road construction work is in progress. Observe the signals. Width limit 11'0". Until August 19, 2019 at about 2:00PM CDT. Between Exit 97: MN 114 (2 miles west of the Alexandria area) and Exit 103: MN 29 (near Alexandria). The roadway is reduced to one lane. The roadway is shared with opposing traffic. Major road construction work is in progress. Expect delays. There is a width limit in effect. Width limit 12'0". Until August 30, 2019 at about 6:00PM CDT. Between 170th Street West (near Farmington) and MN 149 (near Inver Grove Heights). Night time construction work is in progress. Look out for construction work. There are alternating lane closures. Until July 12, 2019 at about 6:30AM CDT. Between Cliff Road (Burnsville) and Exit 5: 106th Street (Bloomington). Bridge construction work is in progress. A lane is closed intermittently. The exit ramp is closed. Until June 30, 2021 at about 5:00PM CDT. Between Exit 24: Ramsey County Road C (Saint Anthony) and US 10 (Mounds View). The right lane is closed. Look out for construction work. Until November 14, 2019 at about 5:00PM CDT. Between Exit 36 (near Lino Lakes) and I-35; I-35E (near Forest Lake). The roadway is reduced to one lane. Major road construction work is in progress. Until October 26, 2019 at about 10:00PM CDT. Between Adams Road (1 mile north of the Floodwood area) and South Town Line Road (5 miles south of the Hibbing area). The roadway is reduced to one lane. There is a width limit in effect. There is a length limit in effect. Road construction work is in progress. Look out for flaggers. Width limit 12'0". Vehicle length limit 75 ft. Until July 22, 2019 at about 2:00PM CDT. Between MN 101; US 10 (near Elk River) and MN 95 (Princeton). Look out for mobile maintenance operations. There are alternating lane closures. From 8:00AM CDT to 5:00PM CDT on weekdays. Until Thursday, at about 5:00PM CDT. Between 900th Street and MN 960A; 7th Street (Heron Lake). The roadway is reduced to one lane because of construction work. There is a width limit in effect. There is a weight limit in effect. Width limit 11'0". No vehicles over 20,000 lbs. Until Saturday, at about 8:00AM CDT. Between Exit 175: MN 105; Oakland Avenue West (near Hayward) and Exit 146: MN 109; Broadway (near Manchester). A lane is closed due to road construction work. There is a width limit in effect. Width limit 11'0". Until October 1, 2019 at about 5:00PM CDT. Between MN 42; County Road 18 (Kellogg) and 347th Avenue Way (1 mile north of the Lake City area). Road construction work is in progress. There are alternating lane closures because the road is being repaved. There is a width limit in effect. Width limit 11'0". Until October 25, 2019 at about 5:00PM CDT. Between County Hwy 5 (Chatfield) and I-90 (4 miles south of the Rochester area). Road construction work is in progress. There are alternating lane closures. There is a width limit in effect. Width limit 11'0". Until September 13, 2019 at about 5:00PM CDT. Between County Highway 10 (Mounds View) and I-694 (Arden Hills). The roadway is reduced to one lane. Look out for construction work. Until July 26, 2019 at about 11:45PM CDT. Between Exit 102: MN 15; North State Street (near Fairmont) and Exit 119: US 169 (Blue Earth). The roadway is shared with opposing traffic due to road construction work. There is a width limit in effect. Width limit 11'0". Until July 2, 2019 at about 8:00AM CDT.
MN 65 in both directions: Opposing traffic sharing the roadway, alternating lane closures, major road construction, paving operations, width limit in effect.
MN 135: Roadway reduced to one lane, width limit in effect, road construction, observe sign.
US 53: Roadway reduced to one lane, width limit in effect, bridge construction, single line traffic - alternating direction.
US 169 in both directions: Construction work, bridge construction, alternating lane closure.
I-35 in both directions: Opposing traffic sharing the roadway, due to road construction work, width limit in effect.
I-94 westbound: Crash.
I-494 eastbound: Road construction, width limit in effect, roadway reduced to two lane.
I-90 westbound: Roadway reduced to one lane, due to road construction work, due to bridge construction work, width limit in effect, speed restrictions in force.
US 61 in both directions: Roadway reduced to one lane, due to road construction work, width limit in effect, speed restrictions in force.
I-35W southbound: Roadway reduced to two lanes, night time construction work.
US 59 in both directions: Construction work, roadway reduced to one lane, entire intersection, look out for flaggers, width limit in effect, length limit in effect.
I-35E northbound: Crash.
US 169 in both directions: Narrow lanes, bridge maintenance operations, look out for flaggers, width limit in effect, speed restrictions in force.
US 169: Right lane closed, road maintenance operation.
US 2 in both directions: Construction work, alternating lane closures, paving operations, look out for flaggers, delay.
MN 282 in both directions: Paving operations, alternating lane closures, pilot car in operation, look out for flagger.
MN 47 in both directions: Roadway reduced to one lane, look out for flagger.
I-94 in both directions: Road construction, roadway reduced to one lane.
US 2 in both directions: Opposing traffic sharing the roadway, construction work, length limit in effect, width limit in effect, gross weight limit in effect, delay.
MN 39: Roadway reduced to one lane, width limit in effect, road construction, observe signal.
MN 210: Paving operations, alternating lane closures, look out for flagger.
US 61 in both directions: Right lane closed, roadway reduced to one lane, due to road construction work, width limit in effect, height limit in effect.
I-94 in both directions: Roadway reduced to one lane, opposing traffic sharing the roadway, major road construction, delays, width limit in effect.
I-94 westbound: Crash.
MN 3 in both directions: Night time construction work, construction work, alternating lane closure.
I-35W in both directions: Bridge construction, intermittent lane closure, exit ramp closed.
I-35W northbound: Right lane closed, construction work.
MN 23: Roadway reduced to two lanes, width limit in effect, speed restrictions in force, long term road construction.
I-35W northbound: Roadway reduced to one lane, major road construction.
MN 73: Roadway reduced to one lane, width limit in effect, length limit in effect, road construction, look out for flagger.
US 169 in both directions: Mobile maintenance operations, alternating lane closure.
MN 60 in both directions: Roadway reduced to one lane, because of construction work, width limit in effect, gross weight limit in effect.
I-90 westbound: Lane closed, due to road construction work, width limit in effect.
US 61 in both directions: Road construction, alternating lane closures, because the road is being repaved, width limit in effect.
US 52 in both directions: Road construction, alternating lane closures, width limit in effect.
US 10 eastbound: Roadway reduced to one lane, construction work.
I-90 in both directions: Opposing traffic sharing the roadway, due to road construction work, width limit in effect.
I-394 eastbound: Crash.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Roadwork/Warning Lane Closure Lane Closure
Flooding Flooding Info Info