MN DOT 511 Traveler Information
Personalized 511 account features are available on the new 511 website. Sign in (or sign up!) and leave us feedback.
Road Reports—Statewide
Map of Statewide Between Exit 28: Ramsey County Road H and Exit 30: US 10 (Mounds View). The roadway is reduced to one lane. Width limit 12'5". Until July 18, 2021 at about 5:00AM CDT. Between Exit 32: 95th Avenue (Lexington) and Exit 26: Ramsey County Road E2 (New Brighton). The roadway is reduced to one lane because of night time construction work. From 8:00PM CDT to 5:00AM CDT on Monday, Tuesday, Wednesday and Thursday. Between West 8th Avenue and County Road 7 (Grand Marais). A lane is closed. Road construction work is in progress. Follow the local detour. Short delays are possible. Until September 20, 2021 at about 2:00PM CDT.
I-35W northbound: Roadway reduced to one lane.
I-35 in both directions: Roadway reduced to one lane, width limit in effect, construction work, changing traffic pattern.
I-35W southbound: Roadway reduced to one lane, due to night time construction work.
MN 61 in both directions: Lane closed, road construction, follow local detour, short delays, see map for detour(s).
US 10 westbound: Crash.
US 10 westbound: Crash.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Roadwork/Warning Lane Closure Lane Closure
Danger Danger Flooding Flooding Info Info Health Warning Health Warning