MN DOT 511 Traveler Information
Road Reports
I‑35 I‑35E I‑35W I‑90 I‑94 I‑494 I‑535 I‑694
See list of highways
Road Reports—South Central MN
Map of South Central MN Between Exit 11 (near Albert Lea) and Iowa State Line (2 miles south of the Twin Lakes area). The roadway is reduced to one lane. The left lane is closed because people are working in the median. Short delays are possible. There is a width limit in effect. Width limit 12'0". Until November 10, 2017 at about 5:00PM CDT. Between 8th Avenue South and 7th Street South (near Saint James). The road is closed to traffic. The road is being reconstructed. A detour is in operation. There is a width limit in effect. There is a weight limit in effect. Follow the detour signs. Width limit 10'0". No vehicles over 80,000 lbs. Until November 6, 2017 at about 1:30PM CDT. Between County 14 Boulevard and MN 19 (near Cannon Falls). The left lane is closed. The roadway is reduced to one lane. The bridge is closed due to bridge construction work. Expect long delays. There is a width limit in effect. A mandatory speed limit is in force. Speed limit 55 MPH. Width limit 10'0". Until Friday, at about 7:00PM CDT. Between I-35; US 218 and US 218 (near Owatonna). The exit ramp is closed. The roadway is reduced to one lane. Road construction work is in progress. A detour is in operation. Short delays are possible. There is a width limit in effect. Width limit 11'0". Until November 15, 2017 at about 11:59PM CDT. Between MN 23 (Marshall) and MN 67 (near Vesta). The roadway is reduced to one lane. Road construction work is in progress. The road is being repaved. A pilot car is in operation. Look out for flaggers. Traffic is being held. Expect delays. There is a width limit in effect. Width limit 12'0". Until Friday, at about 8:30PM CDT. Between US 212 and 830th Avenue (Olivia). The road is closed to traffic. The road is being repaved. A detour is in operation. There is a height limit in effect. There is a weight limit in effect. There is a width limit in effect. There is a length limit in effect. Height limit 13'6". Width limit 12'0". Vehicle length limit 75 ft. No vehicles over 80,000 lbs. Until October 23, 2017 at about 5:00PM CDT. Between Exit 129: MN 97; Lake Drive (near Columbus) and Exit 132: US 8 (near Forest Lake). The left lane is closed. Until Friday, at about 3:00PM CDT. Between Exit 13: 46th Street and Portland Avenue South (near Minneapolis). Major road construction work is in progress. Until October 22, 2021 at about 6:00PM CDT. Between 160th Avenue (Echo) and MN 19 (near Vesta). The roadway is reduced to one lane. Road construction work is in progress. The road is being repaved. A pilot car is in operation. Look out for flaggers. Traffic is being held. Expect delays. There is a width limit in effect. Width limit 12'0". Until Friday, at about 8:30PM CDT. Between 6th Avenue Northeast (Mapleton) and 158th Street (2 miles north of the Mapleton area). The road is closed. Major road construction work is in progress. Bridge construction work is in progress. A detour is in operation. Until November 1, 2017 at about 12:00PM CDT. Between Exit 41: Bridge Street (near Owatonna) and Exit 32: Steele County Road 4 (2 miles north of the Ellendale area). The roadway is reduced to one lane due to bridge construction work. Until October 23, 2017 at about 8:00AM CDT. Between South Meridian Street and Old Highway 169 Boulevard (Belle Plaine). The left lane is closed. The roadway is reduced to one lane. Look out for construction work. Until October 23, 2017 at about 7:00PM CDT. Between MN 292 (1 mile south of the Red Wing area) and US 63; Plum Street (near Red Wing). Bridge construction work is in progress. There is a width limit in effect. Width limit 11'0". Until November 1, 2017 at about 7:00PM CDT. Between Western Avenue Northwest (Faribault) and Monkey Valley Hollow (near Kenyon). There are alternating lane closures due to road construction work. A pilot car is in operation. Short delays are possible. There is a width limit in effect. Width limit 12'0". Until November 3, 2017 at about 5:00PM CDT. Between Exit 132: US 8 (near Forest Lake) and Exit 129: MN 97; Lake Drive (near Columbus). The left lane is closed. Until Friday, at about 8:00PM CDT. Between 26th Street Overpass and Exit 16A: I-94 (Minneapolis). The roadway is reduced to one lane. Road construction work is in progress. From 9:00AM CDT to 3:00PM CDT on Monday and Tuesday. For the next day. Between I-35E (Saint Paul) and Exit 249: I-494; I-694 (near Oakdale). The roadway is reduced to one lane. There are alternating lane closures. Road marking work is in progress. Until Saturday, at about 5:00PM CDT. Between MN 19 (Cannon Falls) and 170th Street East (Coates). The roadway is reduced to one lane. Look out for construction work. Until Friday, at about 11:59PM CDT. Between Exit 124AB: MN 62 (Edina) and Exit 126: Excelsior Boulevard (Hopkins). The roadway is reduced to one lane. Night time construction work is in progress. Until tomorrow at about 5:00AM CDT. Between 4th Street East and 120th Street South (near Hastings). The right lane is closed. Look out for long term road construction work. Until December 9, 2017 at about 5:00PM CDT. Between South Front Street and French Hill Road (near Saint Peter). The bridge is closed. Bridge construction work is in progress. A detour is in operation. Until December 1, 2017 at about 4:00PM CDT. Between I-694; Xerxes Avenue (Brooklyn Center) and Exit 231A: I-394 (Minneapolis). Major road construction work is in progress. Expect delays. Until October 31, 2017 at about 6:00PM CDT. Between 586th Avenue and MN 22 (near Mankato). The road is closed. A detour is in operation. There is a roundabout. Until November 1, 2017 at about 12:30PM CDT. Between Pheasant Avenue and 150th Street (near Fairmont). Look out for construction work. There is a width limit in effect. Width limit 12'0". Until October 27, 2017 at about 12:00PM CDT. Between Maple Avenue (Windom) and Golf Course Road (Mountain Lake). Look out for construction work. There is a width limit in effect. Width limit 10'0". Until October 31, 2017 at about 1:00PM CDT. Between Exit 183: Wright County Road 8 (near Clearwater) and Exit 193: MN 25 (Monticello). Road maintenance work is in progress. There is work on the shoulder. Until tomorrow at about 3:00PM CDT. Between Exit 178: MN 24 (Clearwater) and Exit 193: MN 25 (Monticello). The roadway is reduced to one lane. Night time construction work is in progress. There is a width limit in effect. Width limit 12'0". From 7:00PM CDT to 9:00AM CDT daily. Until November 15, 2017 at about 10:30AM CDT.
I-35 southbound: Roadway reduced to one lane, left lane closed, because people are working in the median, short delays, width limit in effect.
I-494 westbound: Debris on roadway.
I-94 westbound: Exit ramp closed.
MN 4 in both directions: Road closed to traffic, road reconstruction, detour in operation, width limit in effect, gross weight limit in effect, follow the detour signs.
US 52 in both directions: Left lane closed, roadway reduced to one lane, bridge closed, due to bridge construction work, long delays, width limit in effect, a mandatory speed limit is in force.
US 14 in both directions: Exit ramp closed, roadway reduced to one lane, road construction, detour in operation, short delays, width limit in effect.
MN 25 southbound: Right turn bay closed.
MN 19 in both directions: Roadway reduced to one lane, road construction, paving operations, pilot car in operation, look out for flaggers, traffic held, width limit in effect.
US 71 in both directions: Road closed to traffic, paving operations, detour in operation, height limit in effect, gross weight limit in effect, width limit in effect, length limit in effect.
I-35 northbound: Left lane closed.
I-494: Debris on roadway.
I-35W in both directions: Major road construction.
MN 67 in both directions: Roadway reduced to one lane, road construction, paving operations, pilot car in operation, look out for flaggers, traffic held, width limit in effect.
MN 22: Road closed, major road construction, bridge construction, detour in operation.
I-35 southbound: Roadway reduced to one lane, due to bridge construction work.
US 169 in both directions: Left lane closed, roadway reduced to one lane, construction work.
US 61 in both directions: Bridge construction, width limit in effect.
MN 60 in both directions: Alternating lane closures, due to road construction work, pilot car in operation, short delays, width limit in effect.
I-35 southbound: Left lane closed.
MN 100 southbound: Debris on roadway.
I-35W northbound: Roadway reduced to one lane, road construction.
I-94 in both directions: Roadway reduced to one lane, alternating lane closures, road marking operations.
MN 5 in both directions: Roadway reduced to two lanes.
MN 5 in both directions: Roadway reduced to two lanes.
US 52 in both directions: Roadway reduced to one lane, construction work.
US 169 in both directions: Roadway reduced to one lane, night time construction work.
US 61 northbound: Right lane closed, long term road construction.
MN 99 in both directions: Bridge closed, bridge construction, detour in operation.
I-94 in both directions: Major road construction, delays.
MN 83: Road closed, detour in operation, roundabout.
MN 15 in both directions: Construction work, width limit in effect.
MN 60 in both directions: Construction work, width limit in effect.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Roadwork/Warning Lane Closure Lane Closure
Flooding Flooding Info Info