MN DOT 511 Traveler Information
Road Reports
I-35 Whole Road 4 reports
Iowa to Owatonna No reports
Owatonna to 35E/35W split No reports
35E/35W split to Duluth 4 reports
Reports on I-35
Map of Reports on I-35 Between Exit 127: I-35E; I-35W and Exit 132: US 8 (near Forest Lake). Look out for construction work. The right lane is closed. From 6:00AM CDT to 2:00PM CDT on weekdays. Until Friday, at about 2:00PM CDT. Between Exit 132: US 8 (near Forest Lake) and Exit 129: MN 97; Lake Drive (near Columbus). The roadway is reduced to two lanes. Major road construction work is in progress. There is a width limit in effect. Width limit 12'0". Until October 31, 2019 at about 5:00PM CDT. Between Exit 152: Chisago County Road 10 (Harris) and Exit 165: MN 70 (near Rock Creek). The roadway is shared with opposing traffic due to road construction work. There is a width limit in effect. Width limit 11'0". Until September 19, 2019 at about 6:00PM CDT. Between Exit 214: MN 73 (Moose Lake) and Exit 209: Pine County Road 46 (Sturgeon Lake). The right lane is closed. Road maintenance work is in progress. Observe the signs. Until Thursday, at about 4:00PM CDT.
I-35 northbound: Construction work, right lane closed.
I-35 southbound: Roadway reduced to two lanes, major road construction, width limit in effect.
I-35 in both directions: Opposing traffic sharing the roadway, due to road construction work, width limit in effect.
I-35 southbound: Right lane closed, road maintenance operations, observe sign.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Roadwork/Warning Lane Closure Lane Closure
Flooding Flooding Info Info