MN DOT 511 Traveler Information
Check out the new 511 site and leave us feedback!
Reports on I-35: 35E/35W split to Duluth
I-35: 35E/35W split to Duluth
Between Exit 131: Broadway (near Forest Lake) and Exit 129: MN 97; Lake Drive (near Columbus). The roadway is reduced to two lanes. Night time construction work is in progress.
Between Exit 152: Chisago County Road 10 (Harris) and Exit 165: MN 70 (near Rock Creek). The roadway is reduced to one lane. Look out for construction work. Until today at about 8:00PM CDT.