MN DOT 511 Traveler Information
Reports on I-35: 35E/35W split to Duluth
I-35: 35E/35W split to Duluth
Between Exit 131: Broadway and Exit 127: I-35E; I-35W (near Forest Lake). The left lane is closed due to road construction work. Until November 15, 2019 at about 12:00PM CDT.
Between Exit 132: US 8 (near Forest Lake) and Exit 129: MN 97; Lake Drive (near Columbus). The roadway is reduced to two lanes. Major road construction work is in progress. There is a width limit in effect. Width limit 12'0". Until October 31, 2019 at about 5:00PM CDT.
Between Exit 139: Chisago County Route 19 (Stacy) and Exit 132: US 8 (near Forest Lake). Look out for construction work. The left lane is closed. Until today at about 5:00PM CDT.
Between Pine County Road 117 and Exit 171: Pine County Road 11 (Pine City). The roadway is reduced to one lane. Bridge construction work is in progress. Observe the signs. Until today at about 11:00PM CDT.