MN DOT 511 Traveler Information
Personalized 511 account features are available on the new 511 website. Sign in (or sign up!) and leave us feedback.
Reports on I-35: 35E/35W split to Duluth
I-35: 35E/35W split to Duluth
Between Exit 254: 27th Avenue West and Mesaba Avenue (Duluth). The roadway is reduced to one lane. There is a width limit in effect. Look out for construction work. Expect changing traffic patterns. Width limit 12'0". Until October 12, 2021 at about 2:00PM CDT.
Between I-535; US 53 and Exit 259 (near Duluth). The road is closed. Follow the local detour. Look out for a marathon. Until today at about 3:00PM CDT.
Between MN 194; 5th Avenue West and Exit 258 (Duluth). A lane is closed. Road maintenance work is in progress. There is work on the shoulder. Until September 29, 2021 at about 3:00PM CDT.