MN DOT 511 Traveler Information
Personalized 511 account features are available on the new 511 website. Sign in (or sign up!) and leave us feedback.
Reports on I-94: St. Cloud to Brooklyn Center
I-94: St. Cloud to Brooklyn Center
Between Exit 77: MN 78 (near Evansville) and Wisconsin State Line (Lakeland). Air quality is poor. For the next half day.
Between Exit 178: MN 24 and Exit 183: Wright County Road 8 (near Clearwater). The roadway is reduced to one lane. Night time construction work is in progress. Look out for flaggers. Expect delays. Until September 6, 2021 at about 12:00PM CDT.
Between Exit 178: MN 24 (Clearwater) and Exit 205: MN 241 (near Rogers). Look out for construction work. Until October 31, 2021 at about 7:00AM CDT.
Between Exit 194: CR 18 and Exit 205: MN 241 (near Albertville). Look out for construction work. There is a width limit in effect. Width limit 11'0". Until October 31, 2021 at about 12:00PM CDT.
Between Exit 205: MN 241 and Exit 194: CR 18 (near Albertville). The roadway is reduced to one lane. Night time construction work is in progress. Look out for flaggers. Expect delays. Until today at about 7:00AM CDT.
At Exit 205: MN 241 (near Rogers). The roadway is reduced to one lane. The road is closed. Night time construction work is in progress. Look out for bridge demolition work. Bridge construction work is in progress. A detour is in operation. From 7:00PM CDT to 8:00AM CDT daily. Until August 5, 2021 at about 8:00AM CDT.
Between Brockton Lane (near Dayton) and Exit 207: MN 101; Main Street (Rogers). A lane is closed due to road construction work. From 4:00AM CDT to 11:00AM CDT on weekdays.
Between Brockton Lane (near Dayton) and Exit 207: MN 101; Main Street (Rogers). The roadway is reduced to two lanes due to road construction work. From 4:00AM CDT to 12:00PM CDT on weekdays.
Between Exit 28: Hemlock Lane (near Maple Grove) and Exit 207: MN 101; Main Street (Rogers). The roadway is reduced to one lane. Look out for construction work.