MN DOT 511 Traveler Information
Personalized 511 account features are available on the new 511 website. Sign in (or sign up!) and leave us feedback.
I-35: 35E/35W split to Duluth
I-35 in both directions: Roadway reduced to one lane, width limit in effect, construction work, changing traffic pattern.
Between Exit 254: 27th Avenue West and Mesaba Avenue (Duluth). The roadway is reduced to one lane. There is a width limit in effect. Look out for construction work. Expect changing traffic patterns. Width limit 12'0". Until October 12, 2021 at about 2:00PM CDT.
I-35: Lane closed, road maintenance operations, work on the shoulder.
Between MN 194; 5th Avenue West and Exit 258 (Duluth). A lane is closed. Road maintenance work is in progress. There is work on the shoulder. Until September 29, 2021 at about 3:00PM CDT.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on I-35: 35E/35W split to Duluth
Map of Reports on I-35 Between Exit 254: 27th Avenue West and Mesaba Avenue (Duluth). The roadway is reduced to one lane. There is a width limit in effect. Look out for construction work. Expect changing traffic patterns. Width limit 12'0". Until October 12, 2021 at about 2:00PM CDT. Between MN 194; 5th Avenue West and Exit 258 (Duluth). A lane is closed. Road maintenance work is in progress. There is work on the shoulder. Until September 29, 2021 at about 3:00PM CDT.
I-35 in both directions: Roadway reduced to one lane, width limit in effect, construction work, changing traffic pattern.
I-35: Lane closed, road maintenance operations, work on the shoulder.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Roadwork/Warning Lane Closure Lane Closure
Danger Danger Flooding Flooding Info Info Health Warning Health Warning