MN DOT 511 Traveler Information
Personalized 511 account features are available on the new 511 website. Sign in (or sign up!) and leave us feedback.
Reports on I-94: Brooklyn Center to Wisconsin
I-94: Brooklyn Center to Wisconsin
Between Exit 31: Hennepin County Road 81 (near Brooklyn Park) and Exit 215: Weaver Lake Road (Maple Grove). The roadway is reduced to two lanes. Road construction work is in progress. Width limit 11'0". Until September 25, 2021 at about 9:00AM CDT.
Between MN 55; 5th Street and Cedar Avenue (Minneapolis). Look out for a stalled vehicle. A lane is blocked.
Between Western Avenue and Ramsey County Road 33 (Saint Paul). The roadway is reduced to two lanes because the road is being repaved. Until November 1, 2021 at about 6:00AM CDT.