MN DOT 511 Traveler Information
Personalized 511 account features are available on the new 511 website. Sign in (or sign up!) and leave us feedback.
I-90: Albert Lea to Wisconsin
I-90 in both directions: Roadway reduced to one lane, bridge construction, look out for flaggers, delays, width limit in effect.
At Exit 181: 28th Street Northeast (near Austin). The roadway is reduced to one lane. Bridge construction work is in progress. Look out for flaggers. Expect delays. There is a width limit in effect. Width limit 12'0". Until November 5, 2021 at about 5:00PM CDT.
I-90 in both directions: Roadway reduced to one lane, construction work, short delays, width limit in effect.
Between Exit 205: Olmsted County Road 6 and Exit 218: US 52 (near Stewartville). The roadway is reduced to one lane. Look out for construction work. Short delays are possible. There is a width limit in effect. Width limit 11'0". Until August 27, 2021 at about 5:00PM CDT.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on I-90: Albert Lea to Wisconsin
Map of Reports on I-90 Between Exit 205: Olmsted County Road 6 and Exit 218: US 52 (near Stewartville). The roadway is reduced to one lane. Look out for construction work. Short delays are possible. There is a width limit in effect. Width limit 11'0". Until August 27, 2021 at about 5:00PM CDT.
I-90 in both directions: Roadway reduced to one lane, bridge construction, look out for flaggers, delays, width limit in effect.
I-90 in both directions: Roadway reduced to one lane, construction work, short delays, width limit in effect.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Roadwork/Warning Lane Closure Lane Closure
Danger Danger Flooding Flooding Info Info Health Warning Health Warning