MN DOT 511 Traveler Information
Personalized 511 account features are available on the new 511 website. Sign in (or sign up!) and leave us feedback.
Reports on I-35: 35E/35W split to Duluth
I-35: 35E/35W split to Duluth
Between Exit 132: US 8 and Exit 135: US 61; Viking Boulevard (near Wyoming). The roadway is reduced to one lane. Road maintenance work is in progress. Until today at about 2:00PM CDT.
Between Exit 250: US 2 and Exit 249: Boundary Avenue (Proctor). The road is being repaved. Road construction work is in progress. At the rest area. Until September 14, 2021 at about 11:59PM CDT.
Between Exit 254: 27th Avenue West and Mesaba Avenue (Duluth). The roadway is reduced to one lane. There is a width limit in effect. Look out for construction work. Expect changing traffic patterns. Width limit 12'0". Until October 12, 2021 at about 2:00PM CDT.