MN DOT 511 Traveler Information
Reports on US 169
US 169
Between West 150th Street and MN 41; Chestnut Boulevard (near Carver). Look out for construction work. Bridge construction work is in progress. There are alternating lane closures. Until October 31, 2019 at about 3:00PM CDT.
Between MN 41; Chestnut Boulevard (near Carver) and Old Brick Yard Road (near Chaska). The roadway is reduced to one lane. Road construction work is in progress. From 9:00AM CDT to 8:00PM CDT on weekdays. Until Tuesday, at about 8:00PM CDT.
Between Timber Trail Road and Earle Brown Drive (2 to 3 miles south of the Garrison area). Be aware of narrow lanes. Bridge maintenance work is in progress. Look out for flaggers. There is a width limit in effect. Speed restrictions are in force. Width limit 9'0". Until October 18, 2019 at about 12:00PM CDT.