MN DOT 511 Traveler Information
We've been listening to you.Try phase 2 of our updated 511 website and leave us feedback!
Reports on I-35
I-35
Between Exit 131: Broadway (near Forest Lake) and Exit 129: MN 97; Lake Drive (near Columbus). The roadway is reduced to two lanes. Night time construction work is in progress.
Between MN 23 and Exit 195: MN 23 (near Sandstone). Look out for a crash.
Between Exit 235: MN 210 (near Carlton) and Exit 237: MN 33 (near Scanlon). The roadway is reduced to one lane. There is a width limit in effect. Bridge inspection work is in progress. Width limit 12'0". Until Friday, at about 4:00PM CDT.
Between 40th Avenue West and Exit 254: 27th Avenue West (Duluth). The roadway is reduced to one lane. There is a width limit in effect. Road construction work is in progress. Expect changing traffic patterns. Width limit 12'0". Until November 3, 2020 at about 2:00PM CDT.
Between I-535; US 53 and Mesaba Avenue (Duluth). The roadway is reduced to one lane. There is a width limit in effect. Road construction work is in progress. Short delays are possible. Width limit 12'0". Until November 17, 2020 at about 11:59PM CDT.