MN DOT 511 Traveler Information
Check out the new 511 site and leave us feedback!
Reports on US 75
US 75
Between 4th Street Northeast and 7th Street Northeast (Pipestone). The road is closed. The bridge is closed. Bridge construction work is in progress. The road is being repaved. A detour is in operation. Until September 25, 2020 at about 12:00PM CDT.
Between US 212 (2 miles south of the Madison area) and County Highway 14 (Odessa). The road is closed. The road is being repaved. Look out for flaggers. A detour is in operation. Until September 25, 2020 at about 12:00PM CDT.
Between 5th Avenue North and County Road 80 (Wheaton). The road is closed. Look out for construction work. The road is being repaved. Bridge construction work is in progress. A detour is in operation. Until October 3, 2020 at about 12:00PM CDT.
Between 18th Avenue South and 10th Avenue South (Moorhead). The roadway is reduced to one lane. Utility work is in progress. Short delays are possible. Until Friday, at about 7:00PM CDT.
Between MN 1 and County Road 3 (Warren). The roadway is reduced to one lane. Road construction work is in progress. Expect delays. There is a width limit in effect. Width limit 11'0". From 7:00AM CDT to 7:00PM CDT on weekdays. Until September 18, 2020 at about 7:00PM CDT.