MN DOT 511 Traveler Information
US 61
US 61 in both directions: Construction work, alternating lane closures, width limit in effect, speed restrictions in force.
Between I-90 (Dakota) and Jefferson Street (3 miles south of the Winona area). Look out for construction work. There are alternating lane closures. There is a width limit in effect. Speed restrictions are in force. Width limit 14'0". Speed limit 55.00 MPH. Until November 30, 2019 at about 8:00PM CST.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on US 61
Map of Reports on US 61 Between I-90 (Dakota) and Jefferson Street (3 miles south of the Winona area). Look out for construction work. There are alternating lane closures. There is a width limit in effect. Speed restrictions are in force. Width limit 14'0". Speed limit 55.00 MPH. Until November 30, 2019 at about 8:00PM CST.
US 61 in both directions: Construction work, alternating lane closures, width limit in effect, speed restrictions in force.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Roadwork/Warning Lane Closure Lane Closure
Flooding Flooding Info Info