Reports on US 10
US 10
Between 3rd Street Northeast and 5th Street Southeast (Dilworth). The roadway is reduced to one lane. Look out for construction work. From 8:00AM CDT to 8:00PM CDT on weekdays. Until August 21, 2020 at about 12:00PM CDT.
Between Corbet Road and County Highway 54 (Detroit Lakes). The roadway is reduced to one lane. Road construction work is in progress. The road is being repaved. Look out for flaggers. There is a width limit in effect. Width limit 11'0". Until September 21, 2020 at about 7:00PM CDT.
Between 2nd Street Northwest and Harry Rich Drive (Wadena). The roadway is reduced to one lane. There is head to head traffic on the roadway. Road construction work is in progress. There is a width limit in effect. Width limit 11'0". Until August 31, 2020 at about 6:00PM CDT.