MN DOT 511 Traveler Information
I-35
I-35 in both directions: Road construction, alternating lane closures, width limit in effect.
Between Exit 59: MN 21; Lyndale Avenue (Faribault) and Exit 76: Deuce Road (Elko New Market). Road construction work is in progress. There are alternating lane closures. There is a width limit in effect. Width limit 11'0". Until November 7, 2019 at about 5:00PM CDT.
I-35 southbound: Left lane closed, due to road construction work.
Between Exit 131: Broadway and Exit 127: I-35E; I-35W (near Forest Lake). The left lane is closed due to road construction work. Until November 15, 2019 at about 12:00PM CDT.
I-35 southbound: Roadway reduced to two lanes, major road construction, width limit in effect.
Between Exit 132: US 8 (near Forest Lake) and Exit 129: MN 97; Lake Drive (near Columbus). The roadway is reduced to two lanes. Major road construction work is in progress. There is a width limit in effect. Width limit 12'0". Until October 31, 2019 at about 5:00PM CDT.
I-35: Right lane closed, road maintenance operations, reduce your speed.
Between Exit 209: Pine County Road 46 and Exit 214: MN 73 (Sturgeon Lake). The right lane is closed. Road maintenance work is in progress. Reduce your speed. Until tomorrow at about 4:00PM CDT.
I-35 southbound: Right lane closed, width limit in effect, bridge inspection work is in progre.
Between Exit 235: MN 210 (near Carlton) and Exit 227: Carlton County Road 4 (Mahtowa) (4 miles north of the Barnum area). Right lane closed. Width limit in effect. Bridge inspection work is in progress. Width limit 12'0". Starting today at 8:00AM CDT until today at about 4:00PM CDT.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on I-35
Map of Reports on I-35 Between Exit 59: MN 21; Lyndale Avenue (Faribault) and Exit 76: Deuce Road (Elko New Market). Road construction work is in progress. There are alternating lane closures. There is a width limit in effect. Width limit 11'0". Until November 7, 2019 at about 5:00PM CDT. Between Exit 131: Broadway and Exit 127: I-35E; I-35W (near Forest Lake). The left lane is closed due to road construction work. Until November 15, 2019 at about 12:00PM CDT. Between Exit 132: US 8 (near Forest Lake) and Exit 129: MN 97; Lake Drive (near Columbus). The roadway is reduced to two lanes. Major road construction work is in progress. There is a width limit in effect. Width limit 12'0". Until October 31, 2019 at about 5:00PM CDT. Between Exit 235: MN 210 (near Carlton) and Exit 227: Carlton County Road 4 (Mahtowa) (4 miles north of the Barnum area). Right lane closed. Width limit in effect. Bridge inspection work is in progress. Width limit 12'0". Starting today at 8:00AM CDT until today at about 4:00PM CDT.
I-35 in both directions: Road construction, alternating lane closures, width limit in effect.
I-35 southbound: Left lane closed, due to road construction work.
I-35 southbound: Roadway reduced to two lanes, major road construction, width limit in effect.
I-35: Right lane closed, road maintenance operations, reduce your speed.
I-35 southbound: Right lane closed, width limit in effect, bridge inspection work is in progre.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Roadwork/Warning Lane Closure Lane Closure
Flooding Flooding Info Info