MN DOT 511 Traveler Information
I-494
I-494 in both directions: Narrow lanes, construction work.
At Exit 23: Rockford Road (Plymouth). Be aware of narrow lanes. Look out for construction work. Width limit 11'0". Until today at about 6:00PM CDT.
I-494 westbound: Major road construction, alternating lane closures, width limit in effect.
Between Exit 58: I-694; I-94 (near Oakdale) and Tamarack Road (near Woodbury). Major road construction work is in progress. There are alternating lane closures. There is a width limit in effect. Width limit 11'0". Until November 30, 2019 at about 7:00AM CDT.
I-494 eastbound: Roadway reduced to two lanes, major road construction.
Between Exit 59: Valley Creek Road (near Woodbury) and Exit 58: I-694; I-94 (near Oakdale). The roadway is reduced to two lanes. Major road construction work is in progress. Width limit 11'0". Until September 27, 2019 at about 6:00PM CDT.
I-494 eastbound: Roadway reduced to one lane, night time construction work.
At Blaine Avenue (South Saint Paul). The roadway is reduced to one lane. Night time construction work is in progress. Until tomorrow at about 5:00AM CDT.
I-494 in both directions: Left lane closed, roadway reduced to two lane.
Between Exit 71: Pilot Knob Road and Minnesota River Bridge (near Mendota). The left lane is closed. The roadway is reduced to two lanes. Until October 4, 2019 at about 5:00PM CDT.
I-494 westbound: Night time construction work, roadway reduced to one lane, temporary lane marking.
Between MN 13 and Minnesota River Bridge (near Mendota). Night time construction work is in progress. The roadway is reduced to one lane. There are temporary lane markings. Until today at about 6:00AM CDT.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on I-494
Map of Reports on I-494 Between Exit 58: I-694; I-94 (near Oakdale) and Tamarack Road (near Woodbury). Major road construction work is in progress. There are alternating lane closures. There is a width limit in effect. Width limit 11'0". Until November 30, 2019 at about 7:00AM CDT. Between Exit 59: Valley Creek Road (near Woodbury) and Exit 58: I-694; I-94 (near Oakdale). The roadway is reduced to two lanes. Major road construction work is in progress. Width limit 11'0". Until September 27, 2019 at about 6:00PM CDT. Between Exit 71: Pilot Knob Road and Minnesota River Bridge (near Mendota). The left lane is closed. The roadway is reduced to two lanes. Until October 4, 2019 at about 5:00PM CDT. Between MN 13 and Minnesota River Bridge (near Mendota). Night time construction work is in progress. The roadway is reduced to one lane. There are temporary lane markings. Until today at about 6:00AM CDT.
I-494 in both directions: Narrow lanes, construction work.
I-494 westbound: Major road construction, alternating lane closures, width limit in effect.
I-494 eastbound: Roadway reduced to two lanes, major road construction.
I-494 eastbound: Roadway reduced to one lane, night time construction work.
I-494 in both directions: Left lane closed, roadway reduced to two lane.
I-494 westbound: Night time construction work, roadway reduced to one lane, temporary lane marking.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Roadwork/Warning Lane Closure Lane Closure
Flooding Flooding Info Info