MN DOT 511 Traveler Information
US 2
US 2 in both directions: Road construction, roadway reduced to two lanes, opposing traffic sharing the roadway, width limit in effect.
Between Vance Avenue and US 59 (Erskine). Road construction work is in progress. The roadway is reduced to two lanes. The roadway is shared with opposing traffic. There is a width limit in effect. Width limit 12'0". Until November 29, 2019 at about 6:00PM CDT.
US 2: Road closed, width limit in effect, construction work, follow local detour, traffic signal maintenance work, see map for detour(s).
Between 3rd Street and 1st Street (Proctor). The road is closed. There is a width limit in effect. Look out for construction work. Follow the local detour. Traffic signal maintenance work is in progress. Width limit 12'0". Until October 8, 2019 at about 2:00PM CDT.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on US 2
Map of Reports on US 2 Between Vance Avenue and US 59 (Erskine). Road construction work is in progress. The roadway is reduced to two lanes. The roadway is shared with opposing traffic. There is a width limit in effect. Width limit 12'0". Until November 29, 2019 at about 6:00PM CDT. Between 3rd Street and 1st Street (Proctor). The road is closed. There is a width limit in effect. Look out for construction work. Follow the local detour. Traffic signal maintenance work is in progress. Width limit 12'0". Until October 8, 2019 at about 2:00PM CDT.
US 2 in both directions: Road construction, roadway reduced to two lanes, opposing traffic sharing the roadway, width limit in effect.
US 2: Road closed, width limit in effect, construction work, follow local detour, traffic signal maintenance work, see map for detour(s).
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Roadwork/Warning Lane Closure Lane Closure
Flooding Flooding Info Info