MN DOT 511 Traveler Information
I-494
I-494 in both directions: Roadway reduced to two lanes, major road construction.
Between Exit 58: I-694; I-94 (near Oakdale) and Exit 59: Valley Creek Road (near Woodbury). The roadway is reduced to two lanes. Major road construction work is in progress. Until Friday, at about 6:00PM CST.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on I-494
Map of Reports on I-494 Between Exit 58: I-694; I-94 (near Oakdale) and Exit 59: Valley Creek Road (near Woodbury). The roadway is reduced to two lanes. Major road construction work is in progress. Until Friday, at about 6:00PM CST.
I-494 in both directions: Roadway reduced to two lanes, major road construction.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Roadwork/Warning Lane Closure Lane Closure
Flooding Flooding Info Info