MN DOT 511 Traveler Information
I-35W
I-35W northbound: Debris on roadway.
At I-35; I-35E (Burnsville). Look out for debris on the roadway.
I-35W northbound: Traffic incident reported.
Between Exit 1: Dakota County Road 42 and Exit 2: Burnsville Parkway (Burnsville). A traffic incident is reported.
I-35W in both directions: Bridge construction, intermittent lane closure, exit ramp closed.
Between Cliff Road (Burnsville) and Exit 5: 106th Street (Bloomington). Bridge construction work is in progress. A lane is closed intermittently. The exit ramp is closed. Until June 30, 2021 at about 5:00PM CDT.
I-35W northbound: Right lane closed, construction work.
Between Exit 24: Ramsey County Road C (Saint Anthony) and US 10 (Mounds View). The right lane is closed. Look out for construction work. Until November 14, 2019 at about 5:00PM CDT.
I-35W southbound: Roadway reduced to two lanes, night time construction work.
Between Ramsey County Road 96 (Arden Hills) and Exit 26: Ramsey County Road E2 (New Brighton). The roadway is reduced to two lanes. Night time construction work is in progress. Until November 14, 2019 at about 11:45PM CDT.
I-35W southbound: Construction work, changing traffic pattern.
Between Exit 36 (Circle Pines) and Lake Drive (Lexington). Look out for construction work. Expect changing traffic patterns. Until November 14, 2019 at about 11:45PM CDT.
I-35W northbound: Roadway reduced to one lane, major road construction.
Between Exit 36 (near Lino Lakes) and I-35; I-35E (near Forest Lake). The roadway is reduced to one lane. Major road construction work is in progress. Until October 26, 2019 at about 10:00PM CDT.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on I-35W
Map of Reports on I-35W Between Cliff Road (Burnsville) and Exit 5: 106th Street (Bloomington). Bridge construction work is in progress. A lane is closed intermittently. The exit ramp is closed. Until June 30, 2021 at about 5:00PM CDT. Between Exit 24: Ramsey County Road C (Saint Anthony) and US 10 (Mounds View). The right lane is closed. Look out for construction work. Until November 14, 2019 at about 5:00PM CDT. Between Ramsey County Road 96 (Arden Hills) and Exit 26: Ramsey County Road E2 (New Brighton). The roadway is reduced to two lanes. Night time construction work is in progress. Until November 14, 2019 at about 11:45PM CDT. Between Exit 36 (Circle Pines) and Lake Drive (Lexington). Look out for construction work. Expect changing traffic patterns. Until November 14, 2019 at about 11:45PM CDT. Between Exit 36 (near Lino Lakes) and I-35; I-35E (near Forest Lake). The roadway is reduced to one lane. Major road construction work is in progress. Until October 26, 2019 at about 10:00PM CDT.
I-35W northbound: Debris on roadway.
I-35W northbound: Traffic incident reported.
I-35W in both directions: Bridge construction, intermittent lane closure, exit ramp closed.
I-35W northbound: Right lane closed, construction work.
I-35W southbound: Roadway reduced to two lanes, night time construction work.
I-35W southbound: Construction work, changing traffic pattern.
I-35W northbound: Roadway reduced to one lane, major road construction.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Roadwork/Warning Lane Closure Lane Closure
Flooding Flooding Info Info