MN DOT 511 Traveler Information
I-35W
I-35W in both directions: Bridge construction, intermittent lane closure, exit ramp closed.
Between Cliff Road (Burnsville) and Exit 5: 106th Street (Bloomington). Bridge construction work is in progress. A lane is closed intermittently. The exit ramp is closed. Until June 30, 2021 at about 5:00PM CST.
I-35W northbound: Traffic incident reported.
Between Black Dog Road and Minnesota River (near Burnsville). A traffic incident is reported.
I-35W northbound: Stalled vehicle, lane blocked.
Between Exit 6: 98th Street and 94th Street (Bloomington). Look out for a stalled vehicle. A lane is blocked.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on I-35W
Map of Reports on I-35W Between Cliff Road (Burnsville) and Exit 5: 106th Street (Bloomington). Bridge construction work is in progress. A lane is closed intermittently. The exit ramp is closed. Until June 30, 2021 at about 5:00PM CST.
I-35W in both directions: Bridge construction, intermittent lane closure, exit ramp closed.
I-35W northbound: Traffic incident reported.
I-35W northbound: Stalled vehicle, lane blocked.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Roadwork/Warning Lane Closure Lane Closure
Flooding Flooding Info Info