MN DOT 511 Traveler Information
I-35W
I-35W in both directions: Bridge construction, alternating lane closures, intermittent lane closure, exit ramp closed.
Between Cliff Road (Burnsville) and Exit 5: 106th Street (Bloomington). Bridge construction work is in progress. There are alternating lane closures. A lane is closed intermittently. The exit ramp is closed. Until June 30, 2021 at about 5:00PM CDT.
I-35W: Major road construction, road closed, follow the detour sign.
Between Lyndale Avenue (Richfield) and I-94 (Minneapolis). Major road construction work is in progress. The road is closed. Follow the detour signs. From 10:00PM CDT to 8:00AM CDT on Friday and from 10:00PM CDT to 5:00AM CDT on weekdays. Until March 30, 2019 at about 5:00AM CDT.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on I-35W
Map of Reports on I-35W Between Cliff Road (Burnsville) and Exit 5: 106th Street (Bloomington). Bridge construction work is in progress. There are alternating lane closures. A lane is closed intermittently. The exit ramp is closed. Until June 30, 2021 at about 5:00PM CDT. Between Lyndale Avenue (Richfield) and I-94 (Minneapolis). Major road construction work is in progress. The road is closed. Follow the detour signs. From 10:00PM CDT to 8:00AM CDT on Friday and from 10:00PM CDT to 5:00AM CDT on weekdays. Until March 30, 2019 at about 5:00AM CDT.
I-35W in both directions: Bridge construction, alternating lane closures, intermittent lane closure, exit ramp closed.
I-35W: Major road construction, road closed, follow the detour sign.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Roadwork/Warning Lane Closure Lane Closure
Flooding Flooding Info Info