MN DOT 511 Traveler Information
Check out the new 511 site and leave us feedback!
Reports on MN 37
MN 37
Between Gerzin Road (2 miles west of the Iron Junction area) and Fraser Road (near Iron Junction). The roadway is reduced to one lane. There is a width limit in effect. Road construction work is in progress. Width limit 11'0". Until September 30, 2020 at about 2:00PM CDT.
Between US 53 (Eveleth) and MN 135 (Gilbert). The roadway is reduced to one lane. Traffic restrictions are in force. Road construction work is in progress. Look out for flaggers. Width limit 11'0". Until October 20, 2020 at about 2:00PM CDT.