MN DOT 511 Traveler Information
Check out the new 511 site and leave us feedback!
US 61
US 61: Road maintenance operations, head to head traffic on the roadway, width limit in effect.
Between 2nd Street and County Road 4 (1 to 2 miles north of the Wabasha area). Road maintenance work is in progress. There is head to head traffic on the roadway. There is a width limit in effect. Width limit 10'0". Until October 27, 2020 at about 10:00PM CDT.
US 61 in both directions: Road closed, construction work, detour in operation, gross weight limit in effect, see map for detour(s).
Between West Elm Street and Madison Street West (Lake City). The road is closed. Look out for construction work. A detour is in operation. There is a weight limit in effect. No vehicles over 80,000.00 lbs. Until August 10, 2020 at about 7:00PM CDT.
US 61 in both directions: Roadway reduced to one lane, head to head traffic on the roadway, construction work, width limit in effect.
Between East 5th Street and Bush Street (near Red Wing). The roadway is reduced to one lane. There is head to head traffic on the roadway. Look out for construction work. There is a width limit in effect. Width limit 12'0". Until August 20, 2020 at about 5:00PM CDT.
US 61 southbound: Roadway reduced to one lane, utility work.
Between 22nd Street West and 25th Street East (Hastings). The roadway is reduced to one lane. Utility work is in progress. Until today at about 7:00PM CDT.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on US 61
Map of Reports on US 61 Between 2nd Street and County Road 4 (1 to 2 miles north of the Wabasha area). Road maintenance work is in progress. There is head to head traffic on the roadway. There is a width limit in effect. Width limit 10'0". Until October 27, 2020 at about 10:00PM CDT. Between West Elm Street and Madison Street West (Lake City). The road is closed. Look out for construction work. A detour is in operation. There is a weight limit in effect. No vehicles over 80,000.00 lbs. Until August 10, 2020 at about 7:00PM CDT. Between East 5th Street and Bush Street (near Red Wing). The roadway is reduced to one lane. There is head to head traffic on the roadway. Look out for construction work. There is a width limit in effect. Width limit 12'0". Until August 20, 2020 at about 5:00PM CDT. Between 22nd Street West and 25th Street East (Hastings). The roadway is reduced to one lane. Utility work is in progress. Until today at about 7:00PM CDT.
US 61: Road maintenance operations, head to head traffic on the roadway, width limit in effect.
US 61 in both directions: Road closed, construction work, detour in operation, gross weight limit in effect, see map for detour(s).
US 61 in both directions: Roadway reduced to one lane, head to head traffic on the roadway, construction work, width limit in effect.
US 61 southbound: Roadway reduced to one lane, utility work.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Roadwork/Warning Lane Closure Lane Closure
Danger Danger Flooding Flooding Info Info Health Warning Health Warning