MN DOT 511 Traveler Information
Personalized 511 account features are available on the new 511 website. Sign in (or sign up!) and leave us feedback.
Reports on I-90
I-90
Between Exit 18: Rock County Road 3 and Exit 12: US 75 (Luverne). The roadway is reduced to one lane due to road construction work. Until today at about 6:00PM CDT.
Between Exit 50: MN 264 (8 miles east of the Worthington area) and Exit 73: US 71 (near Lakefield). The roadway is reduced to one lane due to road construction work. There is a width limit in effect. Speed restrictions are in force. Width limit 11'0". Speed limit 60.00 MPH. Until November 1, 2021 at about 6:00PM CDT.
Between Exit 107: MN 262; Martin County Road 53 and Exit 99: Martin County Road 39 (near Fairmont). The roadway is reduced to one lane because of bridge maintenance work. There is a width limit in effect. Speed restrictions are in force. Width limit 12'0". Speed limit 60.00 MPH. Until tomorrow at about 8:00AM CDT.
At Exit 181: 28th Street Northeast (near Austin). The roadway is reduced to one lane. Bridge construction work is in progress. Look out for flaggers. Expect delays. There is a width limit in effect. There is a height limit in effect. A detour is in operation. Width limit 12'0". Height limit 14'6". Until November 5, 2021 at about 5:00PM CDT.