MN DOT 511 Traveler Information
Personalized 511 account features are available on the new 511 website. Sign in (or sign up!) and leave us feedback.
I-35W
I-35W in both directions: Roadway reduced to two lanes, night time construction work.
Between MN 55 and 3rd Street (Minneapolis). The roadway is reduced to two lanes. Night time construction work is in progress. Until Monday, at about 5:00AM CDT.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on I-35W
Map of Reports on I-35W Between MN 55 and 3rd Street (Minneapolis). The roadway is reduced to two lanes. Night time construction work is in progress. Until Monday, at about 5:00AM CDT.
I-35W in both directions: Roadway reduced to two lanes, night time construction work.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Roadwork/Warning Lane Closure Lane Closure
Danger Danger Flooding Flooding Info Info Health Warning Health Warning