MN DOT 511 Traveler Information
Personalized 511 account features are available on the new 511 website. Sign in (or sign up!) and leave us feedback.
MN 7
MN 7 in both directions: Roadway reduced to one lane, road construction.
Between Christmas Lake Road (Greenwood) and I-494 (Minnetonka). The roadway is reduced to one lane. Road construction work is in progress. Until November 8, 2021 at about 5:00AM CDT.
MN 7 in both directions: Roadway reduced to one lane, road construction.
Between County Road 101 (Deephaven) and I-494 (Minnetonka). The roadway is reduced to one lane. Road construction work is in progress. Until Monday, at about 6:00PM CDT.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on MN 7
Map of Reports on MN 7 Between Christmas Lake Road (Greenwood) and I-494 (Minnetonka). The roadway is reduced to one lane. Road construction work is in progress. Until November 8, 2021 at about 5:00AM CDT. Between County Road 101 (Deephaven) and I-494 (Minnetonka). The roadway is reduced to one lane. Road construction work is in progress. Until Monday, at about 6:00PM CDT.
MN 7 in both directions: Roadway reduced to one lane, road construction.
MN 7 in both directions: Roadway reduced to one lane, road construction.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Roadwork/Warning Lane Closure Lane Closure
Danger Danger Flooding Flooding Info Info Health Warning Health Warning