MN DOT 511 Traveler Information
Personalized 511 account features are available on the new 511 website. Sign in (or sign up!) and leave us feedback.
Reports on I-35
I-35
Between Exit 87: Crystal Lake Road and I-35E; I-35W (near Burnsville). The road is closed. Bridge maintenance work is in progress. Night time construction work is in progress. Until tomorrow at about 5:00AM CDT.
Between Exit 127: I-35E; I-35W (near Forest Lake) and Exit 165: MN 70 (near Rush City). Air quality is poor. For two days.
Between Exit 147: MN 95 and Exit 139: Chisago County Route 19 (1 mile north of the Stacy area). Look out for debris on the roadway.
Between Exit 159: Rush Lake Road and the end of I-35. Air quality is poor. For two days.
Between Exit 191: MN 23; Railroad Avenue and Exit 183: MN 48; Fire Monument Road (Hinckley). Look out for a crash.
Between Exit 250: US 2 and Exit 249: Boundary Avenue (Proctor). The road is being repaved. Road construction work is in progress. At the rest area. Until September 14, 2021 at about 11:59PM CDT.
Between Exit 254: 27th Avenue West and Mesaba Avenue (Duluth). The roadway is reduced to one lane. There is a width limit in effect. Look out for construction work. Expect changing traffic patterns. Width limit 12'0". Until October 12, 2021 at about 2:00PM CDT.
Between MN 194; 5th Avenue West and Exit 258 (near Duluth). The roadway is reduced to one lane. Road maintenance work is in progress. Follow the signs. Until tomorrow at about 3:00PM CDT.