MN DOT 511 Traveler Information
Personalized 511 account features are available on the new 511 website. Sign in (or sign up!) and leave us feedback.
Reports on I-94
I-94
At MP 143.1. The exit ramp is closed. Bridge construction work is in progress. Follow the detour signs. Until July 10, 2021 at about 6:00PM CDT.
Between Exit 178: MN 24 and Exit 183: Wright County Road 8 (near Clearwater). The roadway is reduced to one lane. Night time construction work is in progress. Look out for flaggers. Expect delays. Until September 6, 2021 at about 12:00PM CDT.
Between Exit 178: MN 24 (Clearwater) and Exit 205: MN 241 (near Rogers). Look out for construction work. Until October 31, 2021 at about 7:00AM CDT.
Between Brockton Lane (near Dayton) and Exit 207: MN 101; Main Street (Rogers). A lane is closed due to road construction work. From 4:00AM CDT to 11:00AM CDT on weekdays.
Between Brockton Lane (near Dayton) and Exit 207: MN 101; Main Street (Rogers). The roadway is reduced to two lanes due to road construction work. From 4:00AM CDT to 12:00PM CDT on weekdays.
Between Exit 28: Hemlock Lane (near Maple Grove) and Exit 207: MN 101; Main Street (Rogers). The roadway is reduced to one lane. Look out for construction work.
Between Exit 215: Weaver Lake Road and Exit 213: 95th Avenue North (Maple Grove). The roadway is reduced to two lanes. Road maintenance work is in progress. Until today at about 11:00AM CDT.
Between Exit 29: US 169 (near Osseo) and MN 100 (Brooklyn Center). The road is closed. Look out for bridge demolition work. Until Monday, at about 5:00AM CDT.
Between Riverside Avenue and Groveland Avenue (Minneapolis). Mobile maintenance operations because of road maintenance activities. Starting tomorrow at 8:00AM CDT until tomorrow at about 4:00PM CDT.
Between Prior Avenue and Exit 238: Snelling Avenue (near Saint Paul). Look out for a crash.
Between Exit 245: White Bear Avenue and Ruth Street (near Maplewood). Look out for a crash.