MN DOT 511 Traveler Information
Personalized 511 account features are available on the new 511 website. Sign in (or sign up!) and leave us feedback.
Reports on I-94
I-94
At Exit 178: MN 24 (Clearwater). The roadway is reduced to two lanes. There is a width limit in effect. Look out for construction work. Short delays are possible. Observe the recommended speed. Width limit 13'0". Vehicle length limit 90 ft. Until October 15, 2021 at about 11:59PM CDT.
Between Exit 178: MN 24 (Clearwater) and Exit 193: MN 25 (Monticello). The roadway is reduced to one lane. Night time construction work is in progress. Traffic is being held. Expect delays. Speed restrictions are in force. Until October 31, 2021 at about 11:59PM CDT.
Between Exit 178: MN 24 (Clearwater) and Exit 205: MN 241 (near Rogers). Look out for construction work. Until October 31, 2021 at about 7:00AM CDT.
Between Exit 194: CR 18 and Exit 205: MN 241 (near Albertville). Look out for construction work. There is a width limit in effect. Width limit 11'0". Until October 31, 2021 at about 12:00PM CDT.
Between Brockton Lane (near Dayton) and Exit 207: MN 101; Main Street (Rogers). The roadway is reduced to two lanes because of construction work.
Between Exit 207: MN 101; Main Street (Rogers) and Brockton Lane (near Dayton). The roadway is reduced to two lanes. Look out for construction work.
Between Exit 207: MN 101; Main Street (Rogers) and MN 610 (near Maple Grove). Roadway reduced to one lane. Starting Sunday at 9:00PM CDT until Monday, at about 5:00AM CDT.
Between Western Avenue and Ramsey County Road 33 (Saint Paul). The roadway is reduced to two lanes because the road is being repaved. Until November 1, 2021 at about 6:00AM CDT.