MN DOT 511 Traveler Information
Personalized 511 account features are available on the new 511 website. Sign in (or sign up!) and leave us feedback.
Reports on I-94
I-94
At Exit 178: MN 24 (Clearwater). The roadway is reduced to two lanes. There is a width limit in effect. Look out for construction work. Short delays are possible. Observe the recommended speed. Width limit 13'0". Vehicle length limit 90 ft. Until October 15, 2021 at about 11:59PM CDT.
Between Exit 178: MN 24 (Clearwater) and Exit 193: MN 25 (Monticello). The roadway is reduced to one lane. Night time construction work is in progress. Traffic is being held. Expect delays. Speed restrictions are in force. Until October 31, 2021 at about 11:59PM CDT.
Between Exit 178: MN 24 (Clearwater) and Exit 205: MN 241 (near Rogers). Look out for construction work. Until October 31, 2021 at about 7:00AM CDT.
Between Exit 194: CR 18 and Exit 205: MN 241 (near Albertville). Look out for construction work. There is a width limit in effect. Width limit 11'0". Until October 31, 2021 at about 12:00PM CDT.
Between Exit 201: Wright County Road 19 and Exit 194: CR 18 (near Albertville). Roadway reduced to one lane. Road maintenance operations. Look out for flaggers. Delays. Starting tomorrow at 5:00AM CDT until tomorrow at about 7:00AM CDT.
Between Exit 202: CR 37; 60th Street Northeast and Exit 205: MN 241 (Albertville). Look out for debris on the roadway.
Between Exit 207: MN 101; Main Street (Rogers) and Brockton Lane (near Dayton). The roadway is reduced to two lanes. Look out for construction work.
Between Exit 207: MN 101; Main Street (Rogers) and MN 610 (near Maple Grove). The roadway is reduced to one lane. Bridge construction work is in progress. From 9:00PM CDT to 5:00AM CDT on weekdays. Until Friday, at about 5:00AM CDT.
Between Exit 31: Hennepin County Road 81 (near Brooklyn Park) and Exit 215: Weaver Lake Road (Maple Grove). The roadway is reduced to two lanes. Road construction work is in progress. Width limit 11'0". Until Saturday, at about 9:00AM CDT.
Between MN 55; 5th Street and Groveland Avenue (Minneapolis). The roadway is reduced to one lane. Look out for construction work. Until Friday, at about 10:00PM CDT.
Between Exit 236: MN 280 (near Lauderdale) and I-35W (Minneapolis). The road is closed. Night time construction work is in progress because of bridge maintenance work. From 10:00PM CDT to 5:00AM CDT daily. Until today at about 5:00AM CDT.
Between Western Avenue and Ramsey County Road 33 (Saint Paul). The roadway is reduced to two lanes because the road is being repaved. Until November 1, 2021 at about 6:00AM CDT.