MN DOT 511 Traveler Information
Personalized 511 account features are available on the new 511 website. Sign in (or sign up!) and leave us feedback.
I-90
I-90 eastbound: Roadway reduced to one lane, because of bridge maintenance work, width limit in effect, speed restrictions in force.
Between Exit 42: Diagonal Road and Exit 43: US 59; Humistan Avenue (Worthington). The roadway is reduced to one lane because of bridge maintenance work. There is a width limit in effect. Speed restrictions are in force. Width limit 12'0". Speed limit 60.00 MPH. Until tomorrow at about 8:00PM CDT.
I-90: Roadway reduced to one lane, due to road construction work, width limit in effect, speed restrictions in force.
Between Exit 50: MN 264 (8 miles east of the Worthington area) and Exit 73: US 71 (near Lakefield). The roadway is reduced to one lane due to road construction work. There is a width limit in effect. Speed restrictions are in force. Width limit 11'0". Speed limit 60.00 MPH. Until December 15, 2021 at about 6:00PM CDT.
I-90 westbound: Roadway reduced to one lane, construction work, width limit in effect, delay.
Between Exit 163 (near Albert Lea) and Exit 146: MN 109; Broadway (near Manchester). The roadway is reduced to one lane. Look out for construction work. There is a width limit in effect. Expect delays. Width limit 14'0". Until November 1, 2021 at about 5:00PM CDT.
I-90 in both directions: Roadway reduced to one lane, bridge construction, look out for flaggers, delays, width limit in effect, height limit in effect, detour in operation, see map for detour(s).
At Exit 181: 28th Street Northeast (near Austin). The roadway is reduced to one lane. Bridge construction work is in progress. Look out for flaggers. Expect delays. There is a width limit in effect. There is a height limit in effect. A detour is in operation. Width limit 12'0". Height limit 14'6". Until November 5, 2021 at about 5:00PM CDT.
Switch to Winter Driving Conditions
Switch to Truck Restrictions
Reports on I-90
Map of Reports on I-90 Between Exit 42: Diagonal Road and Exit 43: US 59; Humistan Avenue (Worthington). The roadway is reduced to one lane because of bridge maintenance work. There is a width limit in effect. Speed restrictions are in force. Width limit 12'0". Speed limit 60.00 MPH. Until tomorrow at about 8:00PM CDT. Between Exit 50: MN 264 (8 miles east of the Worthington area) and Exit 73: US 71 (near Lakefield). The roadway is reduced to one lane due to road construction work. There is a width limit in effect. Speed restrictions are in force. Width limit 11'0". Speed limit 60.00 MPH. Until December 15, 2021 at about 6:00PM CDT. Between Exit 163 (near Albert Lea) and Exit 146: MN 109; Broadway (near Manchester). The roadway is reduced to one lane. Look out for construction work. There is a width limit in effect. Expect delays. Width limit 14'0". Until November 1, 2021 at about 5:00PM CDT.
I-90 eastbound: Roadway reduced to one lane, because of bridge maintenance work, width limit in effect, speed restrictions in force.
I-90: Roadway reduced to one lane, due to road construction work, width limit in effect, speed restrictions in force.
I-90 westbound: Roadway reduced to one lane, construction work, width limit in effect, delay.
I-90 in both directions: Roadway reduced to one lane, bridge construction, look out for flaggers, delays, width limit in effect, height limit in effect, detour in operation, see map for detour(s).
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Roadwork/Warning Lane Closure Lane Closure
Danger Danger Flooding Flooding Info Info Health Warning Health Warning