Between South 1st Street and Southeast 2nd Street (near Minneapolis). The bridge is closed. Bridge construction work is in progress. Follow the detour signs. Until November 18, 2022 at about 6:00PM CDT.
Between South 1st Street and Southeast 2nd Street (near Minneapolis). The bridge is closed. Bridge construction work is in progress. Follow the detour signs. Until November 18, 2022 at about 6:00PM CDT.
Web Comment: Mon, Jan. 4 2021 through November 2022
The Third Ave. Bridge is fully closed
Vehicle and transit detour: Hennepin Ave. and First Ave.
Metro Transit 3rd Ave./Central Ave. bridge detour
Pedestrian detour: Hennepin Ave. Bridge
Bicycle detour: Stone Arch Bridge
For more info associated with this project CLICK HERE
Last updated on December 29