MN DOT 511 Traveler Information
Personalized 511 account features are available on the new 511 website. Sign in (or sign up!) and leave us feedback.
Reports on I-94
I-94
Between Exit 178: MN 24 (Clearwater) and Exit 205: MN 241 (near Rogers). Look out for construction work. Until Wednesday, at about 7:00AM CST.
Between Exit 201: Wright County Road 19 and Exit 202: CR 37; 60th Street Northeast (Albertville). The roadway is reduced to two lanes. Road construction work is in progress. There is a width limit in effect. Width limit 11'0". Until Wednesday, at about 11:59PM CST.
Between Brockton Lane (near Dayton) and Exit 207: MN 101; Main Street (Rogers). The roadway is reduced to two lanes because of construction work.
Between Exit 207: MN 101; Main Street (Rogers) and Brockton Lane (near Dayton). The roadway is reduced to two lanes. Look out for construction work.
Between Exit 30: Boone Avenue and Exit 31: Hennepin County Road 81 (near Osseo). The roadway is reduced to two lanes. Night time construction work is in progress.