MN DOT 511 Traveler Information
Personalized 511 account features are available on the new 511 website. Sign in (or sign up!) and leave us feedback.
Road Reports—Statewide
Map of Statewide Between Exit 31: Hennepin County Road 81 (near Brooklyn Park) and Exit 215: Weaver Lake Road (Maple Grove). The roadway is reduced to two lanes. Road construction work is in progress. Width limit 11'0". Until September 25, 2021 at about 9:00AM CDT. Between West River Road (Champlin) and Calhoun Street (Anoka). The roadway is reduced to one lane. Until September 25, 2021 at about 7:00PM CDT. Between Exit 207: MN 101; Main Street (Rogers) and Brockton Lane (near Dayton). The roadway is reduced to two lanes. Look out for construction work. Between 20th Street and Front Street (Kiester). Railroad crossing closed. Emergency repairs are in progress. Until today at about 6:00PM CDT. Between Laurie Lane and Jonathan Carver Parkway (near Carver). Road construction work is in progress. There is a width limit in effect. Look out for flaggers. Width limit 11'0". Until October 31, 2021 at about 3:00PM CDT.
I-94 westbound: Roadway reduced to two lanes, road construction.
US 169 in both directions: Roadway reduced to one lane.
I-94: Roadway reduced to two lanes, construction work.
MN 22 in both directions: Railroad crossing closed, emergency repair.
I-94 westbound: Crash.
US 212 in both directions: Road construction, width limit in effect, look out for flagger.
I-94 eastbound: Vehicle spun out.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Roadwork/Warning Lane Closure Lane Closure
Danger Danger Flooding Flooding Info Info Health Warning Health Warning