Road Reports—Statewide
Map of Statewide Between Exit 5: 106th Street (Bloomington) and Cliff Road (Burnsville). Night time construction work is in progress. There are alternating lane closures. Short delays are possible. Until tomorrow at about 6:00AM CST. Between Exit 132: US 8 (near Forest Lake) and Exit 129: MN 97; Lake Drive (near Columbus). The roadway is reduced to two lanes. Major road construction work is in progress. There is a width limit in effect. Width limit 12'0". Until October 31, 2019 at about 5:00PM CST.
I-35W southbound: Night time construction work, alternating lane closures, short delay.
MN 23: Roadway reduced to two lanes, width limit in effect, speed restrictions in force, long term road construction.
I-35 southbound: Roadway reduced to two lanes, major road construction, width limit in effect.