MN DOT 511 Traveler Information
US 75 in both directions: Road construction, alternating lane closures, paving operations, pilot car in operation, look out for flaggers, short delays, width limit in effect.
US 75 in both directions: Road construction.
Between MN 19 (Ivanhoe) and MN 68 (Canby). Road construction work is in progress. There are alternating lane closures. The road is being repaved. A pilot car is in operation. Look out for flaggers. Short delays are possible. There is a width limit in effect. Width limit 11'0". Until September 20, 2019 at about 7:00PM CDT.

Web Comment: Width limit 11'. For more information ”Click Here"
Last updated on August 14
US 75 in both directions: Road construction.
Map of US 75 in both directions: Road construction.
Zoom In
Zoom Out
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Roadwork/Warning Lane Closure Lane Closure
Flooding Flooding Info Info